Laserfiche WebLink
Direct Burial Cable <br /> An alternative to trenching through existing pavement is to use direct burial cable. <br /> Direct burial cable can be installed in hazardous locations where fuel <br /> and vapor may be present. It is specifically designed for certain uses <br /> only. It must be installed in the correct manner. <br /> Installing the cable incorrectly or without proper precautions can <br /> result in fire,explosion,electrical shock, hazardous conditions as well <br /> as equipment damage or inaccurate inventory control. <br /> Perform the following: <br /> 1. Use direct burial cable for intrinsically safe wiring only. Do not <br /> use for power wiring. <br /> 2. Do not share conduit for intrinsically safe probes and sensors <br /> with wiring of any other type or from any other system. <br /> 3. Maintain a physical separation of at least 2 inches between probe <br /> and sensor wiring to all other wiring. <br /> 4. When cutting trenches for direct burial cable ensure that you do <br /> j not cut through existing fuel or wiring systems.Obtain as much <br /> site information as possible before cutting the trench. <br /> 5. When grinding trenches in existing pavement for direct burial <br /> cables,wear approved breathing and hearing protection,goggles, <br /> and gloves. <br /> Before considering the direct burial method,check to be sure that direct burial <br /> practices are acceptable at this location.The direct burial method requires grinding <br /> using an abrasive wheel,a 1/4"to 3/8"wide by 1-1/4"deep groove(adding 1/4"of <br /> depth for each additional cable)in the pavement surface,laying Veeder-Root supplied <br /> direct burial cable down in the bottom of the groove,laying an expanded polyethylene <br /> foam backer rod over the cable(s),and then a placing a 1/4"to 1/2"bead of Veeder- <br /> Root recommended silicone sealant over the backer rod to within a minimum of 3/8" <br /> below the pavement surface [see Figure 7]. <br /> If You Decide Upon The Direct Burial Method,Consult The Direct Burial Cable <br /> Q')s Installation Manual For Detailed Installation Instructions[Veeder-Root No. <br /> 576013-8581. <br /> 27 <br />