My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
120
>
2300 - Underground Storage Tank Program
>
PR0515365
>
COMPLIANCE INFO_1999-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 10:06:56 AM
Creation date
6/3/2020 9:59:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2005
RECORD_ID
PR0515365
PE
2361
FACILITY_ID
FA0012107
FACILITY_NAME
A TEICHERT & SON INC*
STREET_NUMBER
120
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
APN
19342006
CURRENT_STATUS
01
SITE_LOCATION
120 FRANK WEST CIR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0515365_120 FRANK WEST_1999-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Direct Burial Cable <br /> An alternative to trenching through existing pavement is to use direct burial cable. <br /> Direct burial cable can be installed in hazardous locations where fuel <br /> and vapor may be present. It is specifically designed for certain uses <br /> only. It must be installed in the correct manner. <br /> Installing the cable incorrectly or without proper precautions can <br /> result in fire,explosion,electrical shock, hazardous conditions as well <br /> as equipment damage or inaccurate inventory control. <br /> Perform the following: <br /> 1. Use direct burial cable for intrinsically safe wiring only. Do not <br /> use for power wiring. <br /> 2. Do not share conduit for intrinsically safe probes and sensors <br /> with wiring of any other type or from any other system. <br /> 3. Maintain a physical separation of at least 2 inches between probe <br /> and sensor wiring to all other wiring. <br /> 4. When cutting trenches for direct burial cable ensure that you do <br /> j not cut through existing fuel or wiring systems.Obtain as much <br /> site information as possible before cutting the trench. <br /> 5. When grinding trenches in existing pavement for direct burial <br /> cables,wear approved breathing and hearing protection,goggles, <br /> and gloves. <br /> Before considering the direct burial method,check to be sure that direct burial <br /> practices are acceptable at this location.The direct burial method requires grinding <br /> using an abrasive wheel,a 1/4"to 3/8"wide by 1-1/4"deep groove(adding 1/4"of <br /> depth for each additional cable)in the pavement surface,laying Veeder-Root supplied <br /> direct burial cable down in the bottom of the groove,laying an expanded polyethylene <br /> foam backer rod over the cable(s),and then a placing a 1/4"to 1/2"bead of Veeder- <br /> Root recommended silicone sealant over the backer rod to within a minimum of 3/8" <br /> below the pavement surface [see Figure 7]. <br /> If You Decide Upon The Direct Burial Method,Consult The Direct Burial Cable <br /> Q')s Installation Manual For Detailed Installation Instructions[Veeder-Root No. <br /> 576013-8581. <br /> 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.