Laserfiche WebLink
Pat <br /> j6RQB,January 2002 <br /> 9. SPILIJONTRFILL CONTAINNIENTBOXEsnl�/�) <br /> facility is Not Equ!rped�''ith Spiiij overfill Containment Boxes <br /> Spil I]/Overfill Contairurient Boxes are Present,but were Not Tested Standard Professional Engineer <br /> Test Method Developed By: Spill Bucket Manufacturer Industry <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum lAydroitatic"N <br /> Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box#Df,,,e Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: 12 <br /> Bucket Depth: 14 <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> Iz test: ----------- <br /> Test Start Time: Z- <br /> initial Reading(RD: <br /> Test End Time: <br /> Final Reading(Rp): .......... <br /> Test Duration: <br /> Change in Reading.(RF--RD: <br /> pamtFail Threshold or <br /> Criteria: <br /> ion on re airs made PriOrIO testing, and recommended follow-up-forfaided tests) <br /> D <br />