Laserfiche WebLink
04/18/2007 15:49 FAX 5306222301 SAVIDGE CONSTRUCTION 0002 <br /> 2 <br /> LO JQDU!2T1017 <br /> This Health and Safety Plan covers the activities to be carried out during the removal <br /> of the underground remote fill line for the existing underground waste oil tank and <br /> replacement of the fill bucket with a CNI retrofit fill bucket This plan may be <br /> upgraded/downgraded at any time, in light of actual site conditions, at the discretion <br /> of the Site Haalth and Safety Officer, <br /> This plan covers all contractor involved in the site activities. It serves as a minimum <br /> guideline for protective measures. Individual contractors may elect to implem=1 <br /> more stringent measures for their own workers. Each contractor will provide health <br /> and safety equipment for its employees only. All other personnel are expected to <br /> provide equal or greater levels of protection for themselves. <br /> All ola-site personnel, regulatory agency personnel, and visitors are expected to be <br /> familiar with,and comply with the provisions of this plan. <br /> 2.0 M IKLQKQ.UND <br /> Mechanic building with waste off tank approximately 20 ft away from building. will <br /> be removing underground remote fill line for the existing underground waste oil tank <br /> and replacement of the fill bucket with a CNI retrofit fill bucket. <br /> 3-41MYPERN—NNEL AROMMS <br /> QuSik-Emmation Con or&PRMWr-W.JWM SAWM SuAlm Cmmiction In <br /> The On-Site Excavation Contractor Supervisor is responsible for oversight of the <br /> excavation, tank removal, and associated activities. He is directly responsible for <br /> construction personnel compliance with the health and saf6ty plan,and will act as Site <br /> Safety Officer(SSO) for Savidge Construction personnel. He will also function as <br /> the competent person for excavation purposes and as the emergency coordinator in <br /> the event of an onsite emergency. <br /> 4,0 10 HAZARD Ate IS <br /> 41 Ehnigd Hazards <br /> The major physical hazards associated with the site are expected to include. <br /> a_ Potential heat stress <br /> b. Work around construction equipment <br /> C. Noise <br /> d, Manual material handling/demolition <br /> e. Open excavations <br /> f Tank and pipeline removal <br /> 9. Confined space entry <br />