Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae I of 2) <br /> TYPE OF ACTION ' Q.NEW PLAN 2.CHANGE OF INFORMATION 490.1 <br /> PLAN TYPE ❑ I.MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. ( 490.2 <br /> (Check one item only) A 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S) C�►�,�i f `��lfr�C' e <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) I I I - I I - 1 <br /> BUSINESS NAME(Same as FACILITY NAME) �Ijnt Inc 3. <br /> BUSINESS SITE ADDRESS (� FjUnk �.-� 103'CC�Clf CITY �� 104. <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR 2632 2634,2638 2641 <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY C] 99.OTHER(Specify): 44y900.;b <br /> III.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN., SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 4�5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: aa.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 49" <br /> PANEL MANUFACTURER: 49D x' MODEL#: 4908 <br /> LEAK SENSOR MANUFACTURER: 4909' MODEL#(S): 49010 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANKISI.(23 CCR§2643) 490.11 <br /> PANEL MANUFACTURER: 490.12' MODEL#: 49013 <br /> IN-TANK PROBE MANUFACTURER: 490-14' MODEL#(S): 49015 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ a WEEKLY 490.16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490-17 <br /> 490.18 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 49019 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490.20 <br /> C] 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: F_] a.36 HOURS ❑ b.60 HOURS 4990.22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490.23 <br /> 490-24 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-25 <br /> 490.26 <br /> ❑ <br /> 99.OTHER(Specify): 490.27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> M.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 49028 <br /> `VIS AL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS: DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 0.90 z9 <br /> X. <br /> PANEL MANUFACTURER 490;0 MODEL#: 490-31 <br /> LEAK SENSOR MANUFACTURER: 49032 1 MODEL#(S): 49033 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. �R a.YES ❑b.NO 490"34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 21�1 YES ❑b.NO 49035 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MILD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 263 490.36 <br /> MLLD MANUFACTURER(S): 490.37 MODEL#(S): 49038 <br /> 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 49039 <br /> ELLD MANUFACTURERS) 4900' MODEL#(S): ( 49041 <br /> PROGRAMMED IN LINE LEAK TEST: 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. Aa.YES ❑b.NO 49043 <br /> ELLD FAILUREMISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 49044 <br /> 4.PIPE INTEGRITY TESTING 49o4s <br /> TEST FRE UENCY Q a.ANNUALLY C1 b.EVERY 3 YEARS 0 c.OTHER S eci 490.46 49047 <br /> 5.VISUAL PIPE MONITORING. 49048 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049 <br /> •Allowed for moni"ag of unbuded emagency genenuor fuel piping only per HSC§Z5281.5(b3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. 490-50 <br /> 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> ❑ 99.OTHER(Specify) 4 s2 <br /> UPCF UST-D(1212007)1/4 <br /> 4 <br />