Laserfiche WebLink
SWRCB, January 2002 <br />Test Method Developed By: <br />Page _ of <br />5. SECONDARY PIPE TESTING RErnimn <br />X Piping Manufacturer 0 Industry Standard 0 Professional ng �eer MW <br />0 Other (Specify) <br />Test Method Used: <br />X Pressure <br />0 Other (Specify) <br />0 Vacuum 0 Hydrostatic <br />ENVIRONMENTAL <br />Test Equipment Used: Pressure Gauge <br />Equipment Resolu?iW. blYFARARTMENT <br />Piping Run # I <br />Piping Run # 2 <br />Piping Run # <br />Piping Run # <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Piping Diameter: <br />4" <br />4" <br />Length of Piping Run: <br />30' <br />30' <br />Product Stored: <br />Diesel <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot <br />Test boot <br />Test boot <br />Test boot <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 min <br />5 min <br />5 min <br />5 min <br />Test Start Time: <br />12:05 <br />12:05 <br />Initial Reading (RI): <br />5 PSI <br />5 PSI <br />Test End Time: <br />1:05 <br />1:05 <br />Final Reading (RF): <br />5 PSI <br />5 PSI <br />Test Duration: <br />I Hour <br />I Hour <br />I Hour <br />I Hour <br />Change in Reading (RF-RO: <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />0 drop <br />0 drop <br />0 drop <br />0 drop <br />Test Result: <br />x Pass 0 Fail <br />x Pass 0 Fail <br />0 Pass 0 Fail <br />0 Pass 0 Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Replaced weather cracked test boots on above ground portion of lines <br />