Laserfiche WebLink
SWRCB, January 2002 5. SECO1f1..4,,VYP`WE-V1,SjV-hTG <br />Test Method Developed By: X Piping Manufacturer 0 Industry Standard 0 Profession ffyirgr <br />2014 <br />0 Other (Specify) <br />Test Method Used: X Pressure 0 Vacuum 0 Hyd EWIRONMENTAI <br />0 Other (Specify) HEALTH man <br />Test Equipment Used: Pressure Gauge <br />-En <br />Equipment Resolution: 0-15 PSI <br /># 4 <br />Piping Run # I <br />Piping Run # 2 <br />Piping Run # 3 <br />Piping Run <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Smith <br />Piping Diameter:— <br />4" <br />4" <br />311 <br />3" <br />Length of Piping Run: <br />30' <br />30' <br />50, <br />40' <br />Product Stored: <br />Diesel <br />Diesel <br />Diesel <br />Gas <br />Method and location of <br />Test boot <br />Test boot <br />Test boot <br />Test boot <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />5 min <br />5 min <br />5 min <br />5 min <br />starting test. <br />Test Start Time: <br />8:30 <br />8:15 <br />Initial Reading (RO: <br />5 PSI <br />5 PSI <br />5 PSI <br />5 PSI <br />Test End Time: <br />9:30 <br />9:15 <br />Final Reading (RF): <br />5 PSI <br />5 PSI <br />5 PSI <br />5 PSI <br />Test Duration: <br />I Hour <br />I Hour <br />I Hour <br />I Hour <br />Change in Reading (RF -R,): <br />0 <br />0 <br />Pass/Fail Threshold or <br />0 drop <br />0 drop <br />0 drop <br />0 drop <br />Criteria: <br />Test Result: <br />0 Pass 0 Fail <br />13 Pass El Fail <br />x Pass 0 Fail <br />x Pass 11 Faii <br />Comments — (include information on repairs made prior to testing, and recommendedfollow-upforfailed tests) <br />Line I unable to test due to hole in test boot at load rack. (west sump) <br />Line 2 unable to test due to tear in boot near Schrader valve at the load rack (west sump) <br />*Please see attached supplemental testform for line test <br />