Laserfiche WebLink
SWRCB, January 00 <br />7. t 1 ' '' i ►VT-letl <br />Test Method Developed By: ❑ UDC Manufacturer ❑ Industry Standard X Professional Engineer <br />❑ Other (Spec) Fc9 0 5 201¢ <br />Test Method Used: ❑Pressure ❑Vacuum X Hydr <br />❑ Other (Specify) <br />NVIRONMENTA <br />Test Equipment Used: Caldwell systems <br />Equipment Resolution: .005130 man <br />Y <br />C# 1&2 <br />UDC # 34 <br />UDC# <br />UDC <br />UDC Manufacturer: <br />Western <br />Western <br />UDC Material: <br />Fiberglass <br />Fiberglass <br />UDC Depth: <br />32" <br />33" <br />Height from UDC Bottom to Top <br />of Highest P!2!ng Penetration: <br />12" <br />12" <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />14" <br />15" <br />Condition of UDC prior to <br />testing: <br />Dry <br />Dry <br />Portion of UDC Tested <br />2" above <br />Highest <br />Piping <br />Penetration <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />x Yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Turbine shutdown response time <br />Is system programmed for fail- <br />safe shutdown?* <br />x Yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />❑Yes ❑ No ❑ NA <br />El Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />operational?* <br />❑ Yes x No ❑ NA <br />❑ Yes x No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />5 min <br />5 min <br />5 min <br />5 min <br />Test Start Time: <br />10:25 <br />10:20 <br />Initial Reading (Ri): <br />.00" <br />.00" <br />.00" <br />.00" <br />Test End Time: <br />10:55 <br />10:50 <br />Final Reading (RF): <br />.00 <br />.00 <br />Test Duration: <br />30 min <br />30 min <br />30 min <br />30 min <br />Change in Reading (RF-Rj): <br />.00 <br />.00 <br />Pass/Fail Threshold or Criteria: <br />.005/30 min <br />.005/30 min <br />.005/30 min <br />.005/30 min <br />TestResult: <br />x Pass ❑ Fail <br />x Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? <br />x Yes ❑ No ❑ NA <br />x Yes ❑ No ® NA <br />x Yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testin ? <br />x Yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />x Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />` If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any_ of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />