Laserfiche WebLink
Monitoring System Certification <br /> F. In-Tank Gauging/SIR Equipment: 0 Check this box if tank gauging is used only for inventory control. <br /> El Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> El Yes El No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> 0 Yes El No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> El Yes 0 No* Was accuracy of system product level readings tested? <br /> 0 Yes Cl No* I Was accuracy of system water level readings tested? <br /> 0 Yes El No* Were all probes reinstalled properly? <br /> 0 Yes El No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): 0 Check this box if LLDs are not installed. <br /> Complete the follo ing checklist: <br /> 0 Yes El No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> E] N/A (Check all that apply) Simulated leak rate: 0 3 g.p.h.; E3 0.1 g.p.h; 110.2 g.p.h. <br /> 0 Yes 0 No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> 0 Yes El No* Was the testing apparatus properly calibrated? <br /> 0 Yes El No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> El N/A <br /> El Yes El No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 0 N/A <br /> • Yes El No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 0 N/A or disconnected? <br /> • Yes El No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> g N/A or fails a test? <br /> El Yes El No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> 0 N/A <br /> 0 Yes El No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> 1, ineecar o- _DC-ff -(,TVrFa' <br /> H. Comme ts: 4- 6hapit Liar Lf4 jeJ Te-st - lvceds to be-, <br /> Page 3 of 3 <br />