My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1330
>
2300 - Underground Storage Tank Program
>
PR0515864
>
COMPLIANCE INFO_2000-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:09:22 PM
Creation date
6/3/2020 9:59:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2009
RECORD_ID
PR0515864
PE
2361
FACILITY_ID
FA0012355
FACILITY_NAME
A&A GAS FOOD MART
STREET_NUMBER
1330
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120053
CURRENT_STATUS
01
SITE_LOCATION
1330 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0515864_1330 E YOSEMITE_2000-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> F. In-Tank Gauging/SIR Equipment: 0 Check this box if tank gauging is used only for inventory control. <br /> El Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> El Yes El No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> 0 Yes El No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> El Yes 0 No* Was accuracy of system product level readings tested? <br /> 0 Yes Cl No* I Was accuracy of system water level readings tested? <br /> 0 Yes El No* Were all probes reinstalled properly? <br /> 0 Yes El No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): 0 Check this box if LLDs are not installed. <br /> Complete the follo ing checklist: <br /> 0 Yes El No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> E] N/A (Check all that apply) Simulated leak rate: 0 3 g.p.h.; E3 0.1 g.p.h; 110.2 g.p.h. <br /> 0 Yes 0 No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> 0 Yes El No* Was the testing apparatus properly calibrated? <br /> 0 Yes El No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> El N/A <br /> El Yes El No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 0 N/A <br /> • Yes El No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 0 N/A or disconnected? <br /> • Yes El No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> g N/A or fails a test? <br /> El Yes El No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> 0 N/A <br /> 0 Yes El No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> 1, ineecar o- _DC-ff -(,TVrFa' <br /> H. Comme ts: 4- 6hapit Liar Lf4 jeJ Te-st - lvceds to be-, <br /> Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.