Laserfiche WebLink
Site Address: Lie • M a.n+ec_of Test in -/Servicing: <br />F. In -Tank Gauging / SIR Equipment: ❑ peck this box if tank gauging is used only for inventory control. <br />Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />U Yes <br />U <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />❑ Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />® Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />❑ Yes ❑ No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />--- -_-- - __, .,.-... .., ......_. ......... .. ...... .. ...... ... w.. uc u..l clm c3 Ircic u1 will uU curl-ecteu. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Com•Dlete the followinu ehecklivt! <br />Yes <br />❑ <br />No* <br />For equipment start-up or annual equipment ce ' kation, was a leak simulated to verify LLD performance? <br />❑ <br />N/A <br />(Check all that apply) Simulated leak rate: 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />Yes❑ <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Y ' <br />❑ No* <br />I Was the testing apparatus properly calibrated? <br />Yes <br />❑ <br />No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />N/A <br />❑ Yes <br />❑ <br />o* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />N/A <br />❑ Yes <br />❑ <br />o* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />N/A <br />or disconnected? <br />❑ Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br />N/A <br />malfunctions or fails a test? <br />❑ Yes <br />4111146'* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />N/A <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />*.:-- " L_.1 .. __. J_____•L _ ._ _ ___ • • .. ... .__ _ <br />In the Sec i <br />-_, _ ..I ...vo... _ uv•. «.. a< .. ..a... U11.G USI L (:1 CJ .vC1 C ur win ue currectea. <br />H. Comments: <br />