Laserfiche WebLink
L. ED PROGRAM CONSOLIDATED FORW <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page 2 of 2) <br /> lll <br /> VI.`UNDER DISPENSER CONTAINMENT(UDC)MONITORING (check <br /> that apply) <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54a. <br /> ❑ 4.NO DISPENSERS F199.OTHER(Specify) 490-54b. <br /> ...................................................................... <br /> ..........................................................-.................................................................................................................................................................. <br /> 490-55. 4 <br /> LEAK MONITOR MANUFACTURER:Veeder Root 490-51, MODEL#:TLS-350 <br /> 490-5 <br /> LEAK SENSOR MANUFACTURER:Veeder Root MODEL#(S):794380-322 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ® a.YES El b.NO 490-599. <br /> . <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-61. <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑ a.YES ® b.NO 490-62. <br /> .................... <br /> ................................................................_........................._.............................................................. <br /> UDC CONSTRUCTION IS: ® I.SINGLE WALL ❑ 2.DOUBLE WALL 4 <br /> 490-64a. <br /> IF DOUBLE WALL: <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ® a.YES ❑ b.NO 490-64b. <br /> VIL PERIODIC SYSTEM TESTING <br /> ❑ 1.ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.[23 CCR§2644.1] <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66. <br /> 490-67. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490-65. <br /> ® a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> ® Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490-69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-69b. <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-69c. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d. <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490-69f. <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> ❑ g. <br /> SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490 69 <br /> 490-69hh <br /> ❑ OTHER(Specify): 490-69i. <br /> ® This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> ➢ Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or 4ndi to win pages with additional information on specific=with <br /> procedures are attached to this plan. 490-71. <br /> T-1 87 and T-2 91 have set at 90%,T-3 Diesel has a =with strai ht tube set at 9844.�1 S% <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> b this plan occurs;2. all conditions that indicate a possible release are investigated;and 3.)all monitoring records are maintained properly. .................................._... <br /> y..... ........... ........... L................. .... ...... ............. . ... P. ................ ..... ........ <br /> THE FOLLOWING PERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: Kevin Hur 490-72. TITLE:Owner/Operator 490-73. <br /> NAME: 490-74. TITLE: 490-75, <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> II. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify thyd t in r on 1p!jov'k4herein is true and accurate to the be <br /> st of myknowledge. <br /> APPLICANT SIGNATURE DAT 4v°-7z <br /> REPRESENTING:0 1.Tank Owner/O er ❑2.Faalullp!m7rE 3.Authorized Representative of Owner 490-76. <br /> APPLICANT NAME(print): 490-7s. A PLICAN TITLE: 490-79. <br /> Kevi Hur <br /> UPCF UST-D(12/2007)-3/4 www.unidoes.org <br />