Laserfiche WebLink
0 0 <br /> Reviewed the Return to Compliance paperwork (received 2/1/17) -incomplete. Reviewed the January <br /> 2017 CERS submittal to check for corrections. <br /> -Violations 105, 107, 110, 115, 121, 201, and 204 were not addressed in the follow up. These violations <br /> were all on pages 4 &5 of the inspection report. <br /> -103-The Certification of Financial Responsibility was uploaded to CERS, but a current CFO letter was <br /> not submitted. <br /> -205-The HMBP response plan was submitted instead of the UST response plan. <br /> -314- No permit has been pulled for repairs at this site. <br /> Called Kevin Hur and went over the corrections still needed. He said he has the CFO letter and will <br /> upload it. He said they are replacing the dispensers soon, and will not have to worry about secondary <br /> containment. I told him dispenser replacement would not fix his secondary containment issues. He said <br /> he will call Elite IV and make sure they pull a permit for secondary containment repairs. I also let him <br /> know it looked like he might have missed following up to pages 4 &5. <br />