Laserfiche WebLink
0 <br /> Elite IV Contractors <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 11 Piping Manufacturer D Industry Standard 0 Professional Engineer <br /> D Other(Specify) <br /> Test Method Used: X Pressure 11 Vacuum D Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Wzl Piping Run#8 Piping Run#91 Piping Run#Die Piping Run# <br /> Piping Material: Fiber Fiber Fiber <br /> Piping Manufacturer: AO Smith Smith Smith <br /> Piping Diameter: 2" 2" 2" <br /> Length of Piping Run: 130' 130' 140' <br /> Product Stored: 87 91 Die <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Min 15 Min 15 Min <br /> starting test: <br /> Test Start Time: 1,100 1,100 1,100 <br /> Initial Reading(R,): 4 PSI 4 PSI 4 PSI <br /> Test End Time: 1,200 1,200 1,200 <br /> Final Reading(RF): 4 PSI 4 PSI 4 PSI <br /> Test Duration: 1 HR 1 HR 1 HR <br /> Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold or 1/16 PSI 1/16 PSI 1/16 PSI <br /> Criteria: <br /> Test Result: X Pass O Fail X Pass 0 Fait X Pass ❑Fail 0 Pass 0 Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> x <br /> , h <br /> �a:n__ <br /> 19 <br /> EA, <br />