My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1330
>
2300 - Underground Storage Tank Program
>
PR0515864
>
COMPLIANCE INFO_2010-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2023 10:44:40 AM
Creation date
6/3/2020 10:00:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2018
RECORD_ID
PR0515864
PE
2361
FACILITY_ID
FA0012355
FACILITY_NAME
A&A GAS FOOD MART
STREET_NUMBER
1330
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120053
CURRENT_STATUS
01
SITE_LOCATION
1330 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0515864_1330 E YOSEMITE_2010-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
486
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r] <br />:I <br />F- In -Tank Gauaino /SIR Eauioment: ❑ Check this box if tank gauging is used only for inv t t <br />C E IVE D <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. JAN 5 2016 <br />Complete the following checklist: <br />Yes [I No` Has all input wiring been inspected for proper entry and termination, including testing for ground faults? TAL <br />MENT <br />` in Section m, Deiow, oescriDe now ano wnen LneSe uenciencie5 were ur winue GVrrecleu. <br />Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />® Yes <br />ElNo* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />ElYes <br />El <br />No; <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />[INo* <br />No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />ElNo* <br />No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />[INo* <br />No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />ElNo* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />` in Section m, Deiow, oescriDe now ano wnen LneSe uenciencie5 were ur winue GVrrecleu. <br />Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />® Yes <br />ElNo* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />[IN/A <br />Simulated leak rate: ® 3 g.p.h.; E]0.1 g.p.h ; [10.2 g.p.h. <br />® Yes <br />❑ <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />® Yes <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />® Yes <br />❑ <br />No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />ElN/A <br />ElYes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />® <br />N/A <br />❑ Yes <br />ElNo* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />® <br />N/A <br />❑ Yes <br />ElNo* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />® <br />N/A <br />❑ Yes <br />❑ <br />No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® <br />N/A <br />® Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments: <br />87 120 3 25 21 PASS <br />91 140 3 28 22 PASS <br />DSL 130 4 27 22 PASS <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.