Laserfiche WebLink
' If the entire depth of the sump is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire surnp must be tested. (See SWRCB LG- 160) <br />SW -RCB, January 2002 <br />Page <br />of <br />6. PIPING SUW TESTING <br />Test Method Developed By- <br />0 Sump Manufacturer <br />0 Industry Standard 'Z�Professional ngmeer <br />0 Other (SP Fc��) <br />Test Method Used: <br />5 'Pressure <br />0 Vacuum <br />�41ydrostatic <br />0 Other <br />Test Equipment Used-: <br />-Vc--Srs� <br />Equipment Resolution: 0-OCill <br />Sump Diameter: <br />140, "40 W1, <br />f eijh_t_��i� Tank Top to Lowe t <br />Electfical Penetration: <br />Portion of Sump, Tested' <br />Does turbine shut down when <br />sump sensor detects liquid (both, <br />Yes 0 No <br />and <br />_E2LO <br />Turbine shutdown response <br />Was fail-safe verified to e <br />onal?* <br />1-Y es 0 No DNA <br />�dYes 0 No 0 NA <br />Wait time between applying <br />Test Start Time: <br />11 <br />iReading (RF): <br />Pass/Fail Threshold or Criteria: <br />111 <br />Test Resul - <br />"10 <br />_Zssenso removed for testing? <br />as serio, <br />R ME <br />0 Yes 0 No <br />11 NA I <br />KNOW= <br />Comments — Lnclude infonnationon repairs made prior to testing, and recommended follow-upforfailed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire surnp must be tested. (See SWRCB LG- 160) <br />