Laserfiche WebLink
11 <br />E <br />SWRCB, January 2002 Page _ of <br />tesiMe,a;o­db�,;Iio­ped i'.. UDC Manufacturer C Industry Standard Professional Engineer <br />C Other (Spec6) <br />Test Method Used: 0 Pressure El Vacuum �eHydrostatic <br />0 Other (Specify) <br />Test Equipment Used: (PW L) T G — Equipment Resolution: 0. 0001 <br />UDC Manufacturer: <br />UDC Material: <br />UDC Dep#�: <br />Height from UDC Bottom to <br />Lo est Electrical Penetration: <br />Condition of UDC prior to <br />testinR: <br />1,11 Portion of UDC Tested <br />Does turbine shut down when I' <br />LJDC sensor detects.liquid (both <br />%Yes 0 No <br />. RR x R1) <br />Ills <br />system programmed for fail- <br />Y' .R 0 No 0" <br />§(Yes El No El NA <br />safe shutdown9. <br />Was fail-safe verified to be <br />A -Yes ElIIA <br />operational?* <br />Wait time between applying <br />pressure/vacuum/water and <br />Test End Time: <br />Test Duration:— <br />Was sensor removed for testing? <br />Yes 0 No 0 NA <br />jj Q, Nil <br />-gYes 0 No 0 NA <br />IM11.0,110 RUN'S <br />If the answer to anjLaLtg_Zuestions indicated with an <br />asterisk (*) is "NO" or "NA". the entire UDC must be tested. (See SVvrRCB LG- 160) <br />