My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1234
>
2300 - Underground Storage Tank Program
>
PR0516248
>
COMPLIANCE INFO_2000-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2023 3:05:39 PM
Creation date
6/3/2020 10:00:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2005
RECORD_ID
PR0516248
PE
2361
FACILITY_ID
FA0012532
FACILITY_NAME
CHEVRON STATION #209167
STREET_NUMBER
1234
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120016
CURRENT_STATUS
01
SITE_LOCATION
1234 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516248_1234 E YOSEMITE_2000-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Xerxes Corporation-Product Specifications http://www.xerxe.,corp.con,/noframes/specs.htm <br /> 9 1* <br /> available on certain larger size tanks and are optional.) <br /> 2. Location is shown on tank drawings. <br /> 3. Optional manways extensions tubes shall be FRP and 24"long. <br /> 4. Each steel manway cover shall have a minimum of three 4"NPT fittings.(See Dimensional Data on page 7-9 for actual size and quantity <br /> of fittings.) <br /> C. Optional Fill Tubes <br /> 1. Fill tubes shall be FRP or contractor supplied and installed aluminum.Locations are shown on drawings. <br /> 2. FRP tubes shall be 4"diameter,with a 6"x 4"double-tapped reducer bushing,and include a 6"NPT fitting.FRP tubes can be installed in <br /> manway cover or tank shell wall.Aluminum tubes(contractor supplied)shall be 4"in diameter and fit directly into a 4"NPT fitting.Tubes <br /> shall terminate a minimum of 4"from the bottom of tank. <br /> D. Gauge Plates-Gauge plates shall be installed under each service fitting and manway opening. <br /> E. Heating Coils <br /> 1. Optional heating coils shall be installed in a separate 22"manway and shall be the standard item supplied by tank manufacturer. <br /> 2. Location is shown in Dimensional Data. <br /> F. Optional Ladders-Ladders shall be the standard ladder as supplied by tank manufacturer(aluminum,carbon steel or fiberglass). <br /> G. NPT Threaded Fittings <br /> 1. All threaded fittings shall be a material of construction consistent with the requirements of the U.L.label. <br /> 2. All standard threaded fittings shall be half couplings and shall be 4"in diameter.Reducers are to be used for smaller sizes where shown <br /> and provided by contractor. <br /> 3• Sizes Standard Other Sizes <br /> Fill 4" <br /> Gauge 4" <br /> Inlet 4" <br /> Outlet 4" - <br /> Vent 4" <br /> Extra 4" <br /> 4. Strength-NPT fittings shall withstand a minimum of 150 foot-pounds of torque and 1,000 foot-pounds of bending,both with a 2:1 safety <br /> factor. <br /> PART III: EXECUTION <br /> 3.01 Installation <br /> Contractor shall be trained by the tank manufacturer,the state or other approved agency. <br /> 3.02 Testing <br /> Tanks shall be installed and tested according to current double wall installation instructions provided with the tank.(Refer to current publication and <br /> include as part of specification.) <br /> Part IV:Warranty <br /> 4.01 Warranty shall be manufacturer's current standard warranty. <br /> 4BACK TOP NEXT � <br /> Guide Specifications -Oil[Water Separator Tanks <br /> Single and Double Wall Tank Models For Storm Water Run-off Applications <br /> SHORT FORM: <br /> The Contractor shall provide fiberglass underground Oil/Water Separator Tanks,in type(single or double wall)and sizes as shown on the drawings.The <br /> separator tanks shall be manufactured by Xerxes Corporation.Separator Tanks shall be tested and installed with pea gravel or crushed stone backfill <br /> material,according to manufacturer's current installation instructions. <br /> LONG FORM: Section 13177-1 <br /> PART I: GENERAL <br /> 1.0 Related Work Specified in Other Sections <br /> A. Cast in Place Concrete:Section 03300 <br /> B. Anchor Bends:Section 05501 <br /> C. Plastic Pipe:Section 15064 <br /> D. Other Related Work-such as excavation,concrete or steel piping. <br /> 1.02 Quality Assurance <br /> 4 of 7 05/19/2000 3:10 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.