My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1234
>
2300 - Underground Storage Tank Program
>
PR0516248
>
COMPLIANCE INFO_2000-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2023 3:05:39 PM
Creation date
6/3/2020 10:00:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2005
RECORD_ID
PR0516248
PE
2361
FACILITY_ID
FA0012532
FACILITY_NAME
CHEVRON STATION #209167
STREET_NUMBER
1234
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120016
CURRENT_STATUS
01
SITE_LOCATION
1234 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516248_1234 E YOSEMITE_2000-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILLING zt CAUTION: <br /> Use only approved backfill material(See Section 3).Do not mix Never allow an empty tank to remain in a wet hole,or a dry hole <br /> approved material with sand or native soil.Do not use native soil that may become wet,unless anchoring and backfilling have <br /> as backfill material.All excavated native soil must be replaced been completed.Failure to anchor and backfill may damage <br /> with approved material. Place one 12 inch lift of material evenly the tank or surrounding property. <br /> around the tank.From the hole side or the top of an adjacent NOTE:Deflection readings to be taken in sequence similar to steps described in <br /> tank,work the material by hand completely beneath the tank Section 5. <br /> body and domes to provide full support. Use a nonmetal probe Pump the water from the hole to maintain minimum water level. <br /> bar long enough to reach beneath the tank and push the backfill Add a minimum of 12 inches of well-placed backfill material to the <br /> in place.Repeat this step with a second 12 inch lift.After the hole,and level the bed to assure uniform bottom support for the <br /> second lift of material has been placed and probed,the backfill tank. Position the tank in the hole. <br /> can be brought to the top of the tank without further hand work. <br /> Partially ballast tank until it settles firmly on the prepared bed. <br /> CAUTIBallast level in a tank must never exceed water level in hole <br /> Do not strike the tank with the probe bar.The tank may be during installation. Use only enough ballast to sink the tank until <br /> damaged and require repair. backfill material is even with the top of the tank. <br /> RIGHT — WRONG D <br /> IIIII- IIIII- <br /> III=IIII) III=IIIII If product is used as ballast,exercise special care in handling. <br /> IIIII= IIII(= Safeguard against sparks,fire or product spills.Improper <br /> II I I=IIIII IIII-IIIII handling of product can cause a fire or explosion,and death, <br /> severe personal injury or property damage. <br /> II=IIIII=IIIII=IIIII=IIIII II-IIIII=IIIII-IIIII-IIIII After leveling tanks,the anchoring procedures in Section 7 must <br /> FIGURE 5-1 FIGURE 5-2 be followed. <br /> When the tank is backfilled to the tank top: Backfill must be added evenly after anchoring,and remaining dry <br /> ®take an intermediate diameter reading as an in-process hole backfilling procedures should be followed as stated in <br /> check. Section 5. <br /> ® repeat the 5 PSIG(3 PSIG for 12 foot tanks)air test as NOTE:Cover depth must meet minimum depth specified in Section 4 of these <br /> outlined in Section 2,soaping all exposed areas of the tank installation instructions. <br /> and all fittings. NOTE:It is recommended that the tank be completely ballasted once backfill is <br /> even with the top of the tank. <br /> SUMMARY <br /> 1.Prepare the tank bed. =1 <br /> 2.Set and level the tanks. - <br /> 3.Measure the tank diameter. <br /> 4. Install holddown hardware(if applicable). - <br /> 5. Place and probe the first two lifts of backfill material. <br /> 6.Add backfill to the top of the tank. z111911111110 <br /> 7. Measure the tank diameter and repeat the air test. FIGURE �1 <br /> After the air test and measurement of tank deflection are <br /> successfully completed, it is recommended that the tank be <br /> ballasted until piping installation and final backfilling to grade is <br /> completed.When filling the tank,make sure that the tank isZL CAUTION: <br /> adequately vented.The vent must be large enough to allow the Xerxes recommends that eve site be thoroughly evaluated <br /> displaced air to escape. every g Y <br /> NOTE:Do not ballast the tank until the backfill is even with the top of the tank. for the potential to trap water or otherwise subject the tank to arise in the local water table.Xerxes recommends that all tanks <br /> 0 <br /> WARNING: be anchored in installations in which water may enter the hole. <br /> If product is used as ballast,exercise special care in handling. Failure to anchor may damage the tank or surrounding <br /> Safeguard against sparks,fire or product spills.Improper property. <br /> handling of product can cause a fire or explosion,and death, EADMAN ANCHOR <br /> severe personal injury or property damage. <br /> A deadman is a reinforced concrete beam.The length of the <br /> deadman is equal to the length of the tank. A deadman may be <br /> ® fabricated in multiple sections as long as the total length is not <br /> WARNING: decreased and each section contains at least two anchor points. <br /> The width and thickness depend on the tank diameter. Refer to <br /> Do not use air pressure to test tanks that contain flammable or Table 7-1 for specific dimensions. <br /> combustible liquids,or vapors,and do not perform any post NOTE:Tanks of 10 foot diameter and 30,000 gallons or larger may require <br /> installation pressure tests.The fuel and air mixture may explode larger deadman to offset buoyancy.Contact Xerxes'Technical Service <br /> and cause death,severe personal injury,or property damage. Department for further information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.