My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1234
>
2300 - Underground Storage Tank Program
>
PR0516248
>
COMPLIANCE INFO_2000-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2023 3:05:39 PM
Creation date
6/3/2020 10:00:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2005
RECORD_ID
PR0516248
PE
2361
FACILITY_ID
FA0012532
FACILITY_NAME
CHEVRON STATION #209167
STREET_NUMBER
1234
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120016
CURRENT_STATUS
01
SITE_LOCATION
1234 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516248_1234 E YOSEMITE_2000-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Criterion for Declaring a Leak <br /> 3. This system <br /> ()0 uses a preset threshold' <br /> ( ) measures and reports the output quantity and compares it to a predetermined threshold <br /> to determine whether the pipeline is leaking. <br /> 4. This system <br /> (X) uses a single test <br /> ( ) uses amultiple-test sequence consisting of tests(specify number of tests <br /> required) separated by hours (specify the time interval between tests) <br /> to determine whether the pipeline is leaking. <br /> 5. This system declares a leak if the output of the measurement system exceeds a threshold of <br /> 1.88 g2]ZhLr (specify flow rate in gal/h) in 1 out of 1 tests (specify, for'example, 1 out <br /> of 2. 2 out of 3). If more detail is required, please specify in the space provided. <br /> Evaluation Approach <br /> 6. There are five options for collecting the data used in evaluating the performance of this <br /> system. This system was evaluated <br /> (X) at a special test facility (Option 1) <br /> ( ) at one or more instrumented operational storage tank facilities (Option 2) <br /> ( ) at five or more operational storage tants facilities verified to be tight (Option 3) <br /> ( ) at 10 or more operational storage tank facilities (Option 4) <br /> ( ) with an experimentally validated computer simulation (,p�tion 5) <br /> pipelinb <br /> 7. A total of 53 tests were conducted on nonleaking X) between 7/$/91. (date) <br /> and 7/20/91 (date). A description of the pipeline configuration used in the evaluation is <br /> summarized in Attachment 3. <br /> Answer questions 8 and 9 if Option 1,2, or S was used. <br /> 8. The pipeline used in the evaluation was 2 in, in diameter, 219 ft long and <br /> constructed of fiberglass (fiberglass,steel, or other). <br /> 9. A mechanical line leak detector <br /> ( ) was <br /> (X) was not <br /> present in the pipeline system. <br /> Answer questions 10 and I1 if Option 3 or 4 was used. NA <br /> 10. The evaluation was conducted on (how many)pipeline systems ranging in <br /> diameter from in. to in., ranging in length from ft to <br /> ft, and constructed of (specify materials). <br /> Pipeline Leak Detection System-Results Form Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.