My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1234
>
2300 - Underground Storage Tank Program
>
PR0516248
>
COMPLIANCE INFO_2000-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2023 3:05:39 PM
Creation date
6/3/2020 10:00:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2005
RECORD_ID
PR0516248
PE
2361
FACILITY_ID
FA0012532
FACILITY_NAME
CHEVRON STATION #209167
STREET_NUMBER
1234
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120016
CURRENT_STATUS
01
SITE_LOCATION
1234 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516248_1234 E YOSEMITE_2000-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> • the waiting time between the last delivery of product to the underground storage tank <br /> and the start of data collection for the test is NA h <br /> .e • the waiting time between the Iast dispensing of product through the pipeline system <br /> and the start of data collection for the test is .27 h <br /> • the total data collection time for the test is .008 h <br /> • the volume of the product in the pipeline is less than twice the volume of the product <br /> in the pipeline system used in the evaluation,unless separate written justification for <br /> testing larger pipeline systems is presented by the manufacturer,concurred with by <br /> the evaluator, and attached to this evaluation as Attachment 8 <br /> • please give any other Hir nations specified by the vendor or determined during the <br /> evaluation: <br /> Disclaimer. This test procedure only addresses the issue of the nstem's abilin,to detect leaks in <br /> pipelines. It does not rest the equipment far safety hazards or assess the operational <br /> functionality, reliability or ntaintainabiliry of the equipment. <br /> AttachtnentS <br /> Attachment I - Description of the System Evaluated <br /> Attachment 2 - Summary of the Performance of the System Evaluated <br /> Attachment 3 -Summary of the Configuration of the Pipeline System(s) Used in the Evaluation <br /> Attachment 4- Data Sheet Summarizing Product Temperature Conditions Used in the Evaluation <br /> Attachment 5 - Data Sheet Summarizing the Test Results and the Leak Rates Used in <br /> the Evaluation <br /> Attachment 6 -Data Sheet Summarizing the Test Results and the Trapped Vapor Tests <br /> Attachment 7- Data Sheet Summarizing the Test Results Used to Check the Relationship <br /> Supplied by the Manufacturer for Combining the Signal and Noise <br /> Certification of Results <br /> I certify that the pipeline leak detection system was operated according to the vendor's <br /> instructions. I also certify that the evaluation was performed according to the procedure <br /> specified by the EPA and that the results presented above are those obtained during the <br /> evaluation. <br /> William D. Glauz Midwest Research Institute <br /> (n;tme of on perf in uation) (organization performing evaluation) <br /> 425 Volker Boulevard <br /> (signature) (street address) <br /> 8/07/91 Kansas City, MO 64110 <br /> (date) (city,state,zip) <br /> (816) 753-7600 <br /> (telephone number) <br /> Pipeline Leak Detection System- Results Form Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.