My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2000-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1234
>
2300 - Underground Storage Tank Program
>
PR0516248
>
COMPLIANCE INFO_2000-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2023 3:05:39 PM
Creation date
6/3/2020 10:00:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000-2005
RECORD_ID
PR0516248
PE
2361
FACILITY_ID
FA0012532
FACILITY_NAME
CHEVRON STATION #209167
STREET_NUMBER
1234
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22120016
CURRENT_STATUS
01
SITE_LOCATION
1234 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516248_1234 E YOSEMITE_2000-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• the waiting time between the last delivery of product to the underground storage tank <br /> and the.start of data collection for the test is NA h <br /> • the waiting time between the last diTensing of product through the pipeline system Noe— <br /> and the start of data collection for the test is 2.5 h <br /> • the total data collection time for the test is 0.3 h <br /> • the volume of the product in the pipeline system is less than twice the volume of the <br /> product in the pipeline system used in the evaluation, unless a separate written <br /> justification for testing larger pipeline systems is presented by the manufacturer, <br /> concurred with by the evaluator, and attached to this evaluation as Attachment 8 <br /> • please give any other limitations specified by the vendor or determined during the <br /> evaluation: <br /> Disclaimer. This test procedure only addresses the issue of the system's ability to detect leaks in <br /> pipelines. It does not test the equipment for safety hazards or assess the operational <br /> finnetnonality, reliabilin' or maintainability of the equipment. <br /> Attachments <br /> Attachment I -Description of the System Evaluated <br /> Attachment 2 -Summary of the Performance of the System Evaluated <br /> Attachment 3 -Summary of the Configuration of the Pipeline System(s) Used in the Evaluation <br /> Attachment 4 - Data Sheet Summarizing Product Temperature Conditions Used in the Evaluation <br /> Attachment 5 - Data Sheet Summarizing the Test Results and the Leak Rates Used in <br /> the Evaluation <br /> Attachment 6- Data Sheet Summarizing the Test Results and the Trapped Vapor Tests <br /> Attachment 7--Data Sheet Summarizing the Test Results Used to Check the Relationship <br /> Supplied by the Manufacturer for Combining the Signal and Noise <br /> Certification of Results <br /> I certify that the pipeline leak detection system was operated according to the vendor's <br /> instructions. I also certify that the evaluation was performed according to the procedure <br /> specified by the EPA and that the results presented above are those obtained during the <br /> evaluation. <br /> William D. Glauz Midwest Resarch Institute <br /> ( of personrfonnin alundon) (organization performing evaluation) <br /> 425 Volker Boulevard <br /> (signature) (street address) <br /> August Z. 1991 Kansas City' MO 64110 <br /> (date) (city,state.zip) <br /> (816) 753-7600 <br /> (telephone number) <br /> Pipeline Leak Detection System-Results Form Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.