Laserfiche WebLink
-AhN <br /> ED PROGRAM CONSOLIDATED F <br /> TANK <br /> UNDERGROUND STORAGE TANKS - TANK PAGE 2 <br /> VI.PIPING CONSTRUCTION(Check all that apply) Page 4 of 4 <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SYSTEM TYPE ®1.PRESSURE [12.SUCTION ❑3.GRAVITY 458 ❑1.PRESSURE ❑2. SUCTION ❑3.GRAVITY 459 <br /> CONSTRUCTION ❑L SINGLE WALL ❑3.LINED TRENCH [199.OTHER 460 ❑1.SINGLE WALL [195.UNKNOWN 462 <br /> MANUFACTURER ®2.DOUBLE WALL ❑95.UNKNOWN ❑2.DOUBLE WALL ❑99.OTHER <br /> MANUFACTURER AO Smith 461 MANUFACTURER 463 <br /> [11.BARE STEEL ❑6.FRP COMPATIBLE W INN. METHANOL ❑1.BARE STEEL ❑6.FRP COMPATIBLE W/100i METHANOL <br /> ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL ❑Unknown ❑2. STAINLESS STEEL ❑7.GALVANIZED STEEL <br /> ❑3.PLASTIC COMPATIBLE W/CONTENTS ❑99. Other ❑3. PLASTIC COMPATIBLE W/CONTENTS ❑8.FLEXIBLE(HDPE) ❑99. OTHER <br /> ®4.FIBERGLASS ❑8.FLEXIBLE(HDPE) ❑4. FIBERGLASS ❑9.CATHODIC PROTECTION <br /> ❑5.STEEL W/COATING [19.CATHODIC PROTECTION 464 ❑5. STEEL W/COATING ❑95.UNKNOWN 465 <br /> VII.PIPING LEAK DETECTION(Check all that apply)(A description of the monitoring program shall be submitted to the local agency.) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING 466 SINGLE WALL PIPING 467 <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> ❑1.ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP SHUT ❑1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP <br /> OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION+ SHUT OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION+ <br /> AUDIBLE AND VISUAL ALARMS. AUDIBLE AND VISUAL ALARMS. <br /> ❑2.MONTHLY 0.2 GPH TEST ❑2. MONTHLY 0.2 GPH TEST <br /> ❑3.ANNUAL INTEGRITY TEST(0.1 GPH) ❑3.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑4. DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS CONVENTIONAL SUCTION SYSTEMS(Check all that apply) <br /> ❑5.DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL PIPING [15. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> INTEGRITY TEST(0.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALUES IN BELOW GROUND PIPING): ❑6. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> [17.SELF MONITORING SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> GRAVITY FLOW [17. SELF MONITORING <br /> ❑9.BIENNIAL INTEGRITY TEST(0.1 GPH) GRAVITY FLOW(Check all that apply): <br /> ❑8. DAILY VISUAL MONITORING <br /> [19. BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> ALARMS AND(Check one) ALARMS AND(Check one) <br /> ®a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ❑a AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> ®b. AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑b AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> DISCONNECTION DISCONNECTION <br /> ❑c. NO AUTO PUMP SHUT OFF ❑c NO AUTO PUMP SHUT OFF <br /> ®11. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SHUT ❑11. AUTOMATIC LEAK DETECTOR <br /> OFF OR RESTRICTION <br /> ®12. ANNUAL INTEGRITY TEST(0.1 GPH) ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM SUCTION/GRAVITY SYSTEM <br /> ❑13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS ❑13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all that apply) EMERGENCY GENERATORS ONLY(Check all that apply) <br /> ❑14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF" ❑14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF" <br /> AUDIBLE AND VISUAL ALARMS AUDIBLE AND VISUAL ALARMS <br /> ❑15. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITHOUT FLOW [115. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) <br /> SHUT OFF OR RESTRICTION <br /> ❑16.ANNUAL INTEGRITY TEST(0.1 GPH) ❑16.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑17. DAILY VISUAL CHECK [117. DAILY VISUAL CHECK <br /> VIII.DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT ❑1.FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑4.DAILY VISUAL CHECK <br /> DATE INSTALLED 468 ®2.CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS ❑5.TRENCH LINER/MONITORING <br /> 7/25/2000 ®3.CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR ❑6.NONE 469 <br /> DISPENSER+AUDIBLE AND VISUAL ALARMS <br /> IX.OWNER/OPERATOR SIGNATURE <br /> I certify that the info ed her' true an curate the best of my knowledge. <br /> SIGNATURE OF ER/ R R DATE 470 <br /> D.,1Z,LERI 08/27/02 <br /> NAME OF OWNS P RAT rint) TITLE OF OWNER/OPERATOR 472 <br /> Chevron Products om any/D.R.L RI Retail ESH S ecialist <br /> Permit Number(For local use only) 473 Permit Approved(For local use only) Permit Expiration Date(For local use only) 475 <br /> UPCF(1/99 revised) 176 Formerly SWRCB Form B <br />