Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED <br /> UNDERGRouND STORAGE TANK <br /> MOMNORINGPLAN-Fuge Iof <br /> 490.1 <br /> TYPE OF ACT 1.NEW PLAN ❑ 2. GE of INFORMATION 49&.2 <br /> &AN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (C ow#em sorry) ❑ 2.THIS PLAN COVERS ONLY THE F01-LOWING UST SYSTEWS): <br /> I. FACILITY INFO ON <br /> -t <br /> 1. <br /> FACILITY ID#(Ar U39 Only) _ <br /> 3 <br /> BUSINESS NAME as Factrity Name or pHA) Chevron Staflon#2 167 <br /> too <br /> 1o3 CITY a ,CA 9 6 <br /> BUSINESS SITE ss 12 Y its v® <br /> E{� G AND pREvENTIVE MAINTENANCE <br /> Testing,preventive nwhiumance,and calibration of monitoring cWil--t(e$>scngOrs,Probm linedetectors,etc.)Inst be perhaued at t&e frequency specified <br /> t •' uctions,or annuall whichever is more 2Sucut Such _m_ust be d used er lttssei,#23Cm F263z-263,!I-2-w-8-264!L- <br /> 49Q-3m- <br /> MONITORING <br /> 634,2-w 264!L490-3m- <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 499.3b. <br /> M. MONITORING LOCATIONS <br /> ❑ 490.4 <br /> 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN 2_SITE PIAT PLAN PREVIOUSLY SUBMITTED 123 CCR 12632,41 <br /> . TANK M4:)NffoMG IS pERFORMD USING T FOLLOWING METHOD(S) &.1 gpply <br /> 1.CONTINUOUS ELwmDNc TANK moNiTURP35,OF ANNULAR( RSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 4W5 <br /> WITH AUDIBLE AND VISUAL ALARMS.las CCR 82632,26341 49� <br /> SECONDARY CONTAINMENT LS- a DRY ❑ b, El FILLED ❑ c.PRESSURIZED d.UNDER VACUUM: 490 s <br /> 490.7. MODEL#: TLS-M <br /> PANEL MANUFACTURER- V ar- of 490.10. <br /> LF_AKSE MANUFACTURER: Y er- Ot MODEL#(S): I.iould�____ - <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MON SINGLE WAI t TA_NKdyj 123 CCR 626431 X01 <br /> 490-12- MODEL 9: 490-13 <br /> PANEL MANUFACTURER 415 <br /> IN TANK PROBE MANUFA 414 MODEL#(S}. <br /> DAlLYlNAGHTLY c, 480-s6. <br /> LEAK TEST FREQUENCY: ❑ a . 490-47 <br /> ❑ d.MONTHLY ❑ c.OTHER(Spccify): <br /> 494-ie. <br /> PROGRAMMED TESTS: ❑ a 0.1 g.p.h. ❑ b.0.0-g p.h- ❑ c.OTHER(Specify)-. 490.19 <br /> [] 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION 123 CCR42W II <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR 625451 TESTING IOD: ❑ a 36 HOURS ❑ b.60 HOURS _-- 4 <br /> 490-23. <br /> ❑ 5.TANK INTEGRITY TESTING PER P3 CCR 12643 11 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OT (Specify). 4ar25. <br /> 490• <br /> ❑ 99.OTHER(Specify): 490 27. <br /> (c�o<alr <br /> V. pIpE MOMTORWG IS pERFORMD USING THE FOLLOWING OD{S} rt�r <br /> i.CONTINUOUS MONPfORING Of PIPE/PIPING SUMPS)AND OTHERS SECONDARY CONTAINMENT WITH AUDIBLE 6t VISUAL ALARMS, 46m-29. <br /> 123 <br /> 1 SECONDARY CONTAINMENT IS- a-DRY 0 b.LIQUID FILLED c.PRESSURIZED ❑ d.UNDER VACUUM 490-31. <br /> 490'3Q EL#: TLS-M <br /> PANEL MANUFACTURER-V Sr-R t 490-33 <br /> 490-12, s;.d•id& r___' 438 <br /> 390-205 <br /> LEAK SENSOR de <br /> UFACTUREW Y r OI MODEL#{S}; ,� <br /> a YES ❑ b.NO 490.34. <br /> PIPING LEAK M ERS AUTOMATIC P (i.e.,TURBINE)SH1. WN. 4 35 <br /> FAiLUREIDISCONNECTION OF THE MONITORING SYS TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES [Ib.NO <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PO S 3-0 g p.h-LEAK TESTS AND RESTRICTS OR SHUTS O 490-36, <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.123 CCR62w6l 490.37 MODEL#(S): 490-38 <br /> MLLD UFACTURER(S): - ---- 490.39. <br /> 10 3.ELBCMONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g ph LEAK TESTS.(23=126361 490-41 <br /> ELLD MANUFACTURER(S):V $ oot 49"0MODEL#(S):PL '• <br /> 949498403 42 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ aMINIMUM MONTHLY 4.2 g.p.h. ❑ b_MINIMUM ANNUAL 0.1 g p.h. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. a YES ❑ b.NO 4944 <br /> 3 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN- a YES [I b.NO 49044 <br /> ® 4.PIPE MTWRITY TESTING. 490 46 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Spccify) 417 <br /> 49 <br /> ❑ 5.VISUAL PIPE MONITORING. <br /> FREQUENCY: a.DAILY ❑ b.WEEKLY ❑ c. MONTHLYEnCH TIME SYSTEM O) TED* 490 49 <br /> rttsClzszslsObx31..�-- <br /> __ <br /> ❑ 6.SUCTION PIPING MEETS__ PTION CRITERIA.Im CCR 1 8X3)1 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. <br /> ❑ <br /> 99.OTHER(Specify) 4sd s3 <br />