Laserfiche WebLink
SWRCB. January 2002 11'a -e 7 or <br />9. SPILL/OVERFILL CONTAINMENT BOXER <br />n <br />racnity is Not tquippeci With Spill/Overfill Containment Boxes <br />Spill/Overfill Containment Boxes are Present, but were Not Tested <br />'rest Method Developed By: j Spill Bucket Manufacturer�ndustry Standard Professional Engin­c; <br />I Other (Specify) <br />'rest Method Used: j Pressure Vacuum [_Hydrostatic <br />I Other (Specify) <br />'Fest Equipment Used: Equipment Resolution: <br />V e: <br />Spill Box 4 <br />Spill Box # Spill Box 4 <br />Bucket Diameter: <br />Bucket Depth: <br />Wait time between applying <br />pressure/vacuum/water and <br />jr-starting test: — <br />1 Test Start Time: <br />Initial Reading (R 1): <br />i Test End Time: <br />j Final Reading (Rt): <br />Test Durat n: yl� <br />Change in Reading (W-111) Air <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: I aLPass <br />:Pass f );Fail < T I —Pass —fl Fail <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />F1 ffF5'-b Lc t, -5,-/ n� A Pb Irs rFs riz <br />