Laserfiche WebLink
SWRCB. January 2002 <br />9. SPILL/OVERFILL CONTAINMENT ROWER <br />Page 7 of 7 <br />Facility is Not Equipped With Spill/Overfill Containment Boxes <br />S ill/Overfill Containment Boxes are Present, but were Not Test <br />Test Method Developed By: [ J Spill Bucket Manufacturer ndustry Standard [ j Professional Engineer <br />Other S eci <br />Test Method Used: [ ) Pressure [ J Vacuum [ II-Ky—drostatic <br />Other S eci <br />Test E ui ment Used: E uii)ment Resolution: <br />0010 a, <br />•e <br />Comments —(include informat on on repairs made prior to 4esting, and recommended follow-up for failed tests) <br />Lr� D C.6 60- kL VA�Of_=4 iG el-- r. <br />Sill Box # <br />S pill Box # <br />Sill Box # <br />Bucket Diameter: <br />tr <br />_ <br />z L"', <br />Bucket De the <br />« <br />y <br />Wait time between applying <br />pressurclvacuumh✓ater and <br />starting test: <br />- <br />Test Start Time: <br />p <br />s <br />Initial Reading (RI): <br />Test End Time:(� <br />7 30 <br />Final Reading (Ri : <br />Test Duration: <br />2' <br />Change in Reading (Rf-RI) <br />Pass/Fail Threshold or.. <br />Criteria: <br />Test Result: <br />_ <br />]Pass : j Fail <br />Comments —(include informat on on repairs made prior to 4esting, and recommended follow-up for failed tests) <br />Lr� D C.6 60- kL VA�Of_=4 iG el-- r. <br />