My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3304
>
2300 - Underground Storage Tank Program
>
PR0516354
>
COMPLIANCE INFO_2002-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 11:44:26 AM
Creation date
6/3/2020 10:00:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2007
RECORD_ID
PR0516354
PE
2361
FACILITY_ID
FA0012437
FACILITY_NAME
CHEVRON 352324
STREET_NUMBER
3304
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
07120013
CURRENT_STATUS
01
SITE_LOCATION
3304 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516354_3304 W HAMMER_2002-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 3, 2004 <br />Hammer Lane Exxon <br />Attention: Rajendra Seth or <br />Current Operator <br />3304 W. Hammer Lane <br />Stockton CA 95219 <br />Re: 3304 Hammer Lane, Stockton <br />A recent review of the underground storage tank (UST) file for the above referenced facility indicated <br />that this office has not received your annual monitoring certification and line leak detector <br />certification. According to Title 23, California Code of Regulations, Section 2637 (b), this testing <br />must be performed at least once every 12 months. According to section 2636 (f)(4), you must submit <br />your pressurized line tightness test to this office annually (unless exempt under section 2636 (g)). <br />If these tests have not been performed in accordance with the required time frames, then schedule the <br />monitoring certification, line leak detector certification, and pressurized line tightness test with a <br />certified technician by March 3, 2004. <br />In addition, this office must be notified of the test date and time 48 hours prior to performing any of <br />the above tests. Results from the above testing must be sent to this office within 30 days of the test <br />completion. It is the responsibility of the owner/operator to have all test results submitted to <br />this office by April 3, 2004. <br />If you have any, questions regarding this matter you may contact Michelle Le, Senior RENS at (209) <br />468-9847. <br />Thank you, <br />A�� <br />Michelle Le, Sr. RE <br />Registered Environmental Health Specialist <br />ENVIRONMENTAL EPA ENT <br />P°U,N <br />SAN J JIN COUNTY <br />Donna K. Heran, R.E.H.S.Carl <br />.A <br />304 East Weber Avenue, Third Floor <br />Unit Supervisors <br />Borgman, R.E.H.S. <br />`.: <br />• <br />•., <br />Director <br />Al Olsen, R.E.H.S. <br />Stockton, California 95202-2708 <br />Mike Huggins, R.E.H.S., R.D.I. <br />Douglas W. Wilson, R.E.H.S. <br />�P <br />Program Manager <br />Telephone: (209) 468-3420 <br />Margaret Lagorio, R.E.H.S. <br />9�rF6R <br />Laurie A. Cotulla, R.E.H.S. <br />Fax: (209) 464-0138 <br />Robert McClellon, R.E.H.S. <br />Program Manager <br />Mark Barcellos, R.E.H.S. <br />February 3, 2004 <br />Hammer Lane Exxon <br />Attention: Rajendra Seth or <br />Current Operator <br />3304 W. Hammer Lane <br />Stockton CA 95219 <br />Re: 3304 Hammer Lane, Stockton <br />A recent review of the underground storage tank (UST) file for the above referenced facility indicated <br />that this office has not received your annual monitoring certification and line leak detector <br />certification. According to Title 23, California Code of Regulations, Section 2637 (b), this testing <br />must be performed at least once every 12 months. According to section 2636 (f)(4), you must submit <br />your pressurized line tightness test to this office annually (unless exempt under section 2636 (g)). <br />If these tests have not been performed in accordance with the required time frames, then schedule the <br />monitoring certification, line leak detector certification, and pressurized line tightness test with a <br />certified technician by March 3, 2004. <br />In addition, this office must be notified of the test date and time 48 hours prior to performing any of <br />the above tests. Results from the above testing must be sent to this office within 30 days of the test <br />completion. It is the responsibility of the owner/operator to have all test results submitted to <br />this office by April 3, 2004. <br />If you have any, questions regarding this matter you may contact Michelle Le, Senior RENS at (209) <br />468-9847. <br />Thank you, <br />A�� <br />Michelle Le, Sr. RE <br />Registered Environmental Health Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.