Laserfiche WebLink
FEB.25.2003 10:47AM <br />SCOTT CO <br />NO.615 P.32/40 <br />SWRCB, January 2002 <br />Page of <br />S. SECONDARY <br />Test Method Developed By; <br />Piping Manufacturer industry <br />Professional Engineer <br />Other }y} <br />Test Method Used: <br />re <br />Vacuum <br />Hydrostatic <br />Other i cam} <br />Test Equipment Used: <5. ^ <br />• <br />Equipment Resolution: <br />Piping Run 4 tPiping <br />Rum #'3 <br />Piping Run Piping)k2un # <br />Piping Material: <br />m 1G,55 <br />.i~, 1c's3 <br />Jr.ta• 1A <br />Piping Manufacturer: <br />Piping Diameter <br />G Mao <br />Length of Piping Rua: <br />Product Stored: <br />tr <br />un <br />Method and location of <br />i• Len isolation: <br />3 � <br />b -< <br />Wait time between applying <br />pressure/vacuum/water and <br />stardus test: <br />�' <br />6 <br />Test Start Time: <br />Initial Reading (RI).- <br />Test End Tighe: <br />Final Reading (Rp); <br />{ <br />Test Durazioir <br />} <br />Change in Reading (RrRI): <br />v <br />v <br />e.a <br />Pass/Fail Threshold or <br />U <br />Criteria: <br />a <br />�eSt RCSHtt:. <br />, ,� 'P�Ss; '• Q'.i+aal , o ' " �� <br />' a � • <br />"a� 1?`a�s:. la,P�,.,,,,,, 'paas; � ���p"�il.:-;. pr . R Fa • .4 i��' �, <br />Comments — Oinclude fnforrnarivn on repairs made asLar as resting, and recommends follow-rip for foiled tests% <br />