Laserfiche WebLink
FEB, 25.2003 <br />10: 50AM SCOTT CO NO.615 .. -P. 39/40' `""` — <br />F. Yn-'X'ss>;k Gnu 'st ! SIR ui naesla. ,. • <br />gig 4 P Chrck this box if sink gauging is used only for inventory oontrot <br />❑ Check itus box if no =* gouging or Slat equipment is iarsrailed. <br />This section must be completed if in -tank awuging eqU pr=r is used to perform leak detection monitoring. <br />follmv na checklist. <br />NO* <br />Has ail inppt wiring been inspected for propor entry and ttamination, including testing for ground faults? <br />No• <br />f Were all ;rtrik gauging probes visually inspected for d=2a-a and residue buildup? <br />No'" <br />EWsq <br />Was accuracy pf system product level readings tested? <br />ow <br />Was accuracy of system Water level readings tested? <br />ow <br />Were all probes reinstalled properly? 7-1o* <br />Were all items on tate equipment manufacturer's maintenance checklist completed? <br />In the Section ?3, below, descxibc how and Wlsen these defte3etacies were or'will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LUrsa are not installtd. <br />Complete the following checklist; <br />Yes D No, <br />® NIA <br />For equipment start-up or annual equipment ertifination, wAs a leak Simulated CO verify LS,D perforrna=9 <br />(Check all char Appty} SirAulatcd leak rate: 3 g.p.h.: O 0.1 g.p.h ; ❑ 0.2 g.p.h. <br />Yes ❑ Na* <br />Were all =s confirrned operational and accurate within regulatory requirements? <br />es <br />Y ❑ No* <br />Was the testing apparatus properly calibrated? <br />K.Yes ❑ No* <br />For machanical LLDs, does the LLD restrict product flour if it detects a leak? <br />0 N/A <br />Q Yes12 No. <br />Foe electronic LLDs, does the turbine aummatticnIly shut off if the LLD detects a leak? <br />NIA <br />q Yes Now <br />For cltemmnic LLDs, does the Rtrbine automatically shut off if any portion of the Monitoring system is disabled <br />Qr NIA <br />or disconnected? <br />® Yes 10 Now <br />For electronic LLDs, does the turbine autotn2dcatly shut off if any portion of the monitoring system malfuncti'14ons <br />NIA <br />or fails a test? <br />❑ Yes Now <br />For electronic LLDs, have all nceessible Wiringconnections been visuaUy inspected? <br />NIA <br />vas Ne <br />Were all items on the equipment rnanufacturer's maintenance checklist completed? <br />�` In the Section H. below, describe how and when these deficiencies were or wlll'be corrected. <br />I3. Comments: <br />s <br />} <br />Page 3 of 3 t19/pl <br />