Laserfiche WebLink
.1, —TrU nDAUTkir TWFnRMAT[ON � • <br />1, <br />Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br />2. <br />Plans drawn to scale in non -erasable print. <br />3. <br />Plot plan to show location of tanks and all associated piping. <br />CAPACITY <br />q. <br />Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />Liu <br />5_ <br />Tank cross-sectional diagram. <br />MANUFACTURER <br />6. <br />Detail of tank, associated piping, excavation and cover. <br />7. <br />Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, <br />Chapter 16, <br />Article 3, Section 2631 (b) & 26351 <br />g, <br />Verification of product compatibility with the tank(s), piping, monitoring <br />MODEL <br />EI On <br />device(s), epoxy or silicone glues, etc. <br />9. <br />Manufacturer's written installation instructions for tank(s), piping, monitoringdevices, etc. <br />PRODUCT <br />10. <br />riot to installation a tightness test shall be perfor ed on both primary <br />At the installation site, p , <br />(1°) and <br />secondary (20) containment systems before covering. [Section 2635 (a) (P & (k")] <br />CORROSION PROTECTION <br />P5 <br />11. <br />Tank integrity test required upon completion of installation with tan//ino ating condition. Test <br />results to be <br />�S <br />submitted directly to PHS-EHD from the testing company or owner of f[Health & Safety Code, <br />Division 20, <br />Chapter 6.7, Section 25291 (h)] <br />COMPATIBILITY WITH 100% <br />METHANOL <br />S <br />PS <br />QS <br />IL. <br />TANK # <br /># <br /># <br /># 3v <br />' <br /># <br />CAPACITY <br />011 0 <br />Liu <br />MANUFACTURER <br />tt <br />�l�© <br />J00 <br />COMPOSITION <br />e <br />MODEL <br />EI On <br />�IV�(0 <br />PRODUCT <br />d&,(,AI <br />' line <br />b di <br />CORROSION PROTECTION <br />P5 <br />U.L. LISTED <br />�S <br />t '7 <br />-yes <br />COMPATIBILITY WITH 100% <br />METHANOL <br />S <br />PS <br />QS <br />i <br />13. TANK(s) TO BE INSTALLED <br />A. Steel -clad with fiberglass einforced plastic coatings, composites, or equivalent non-metallic exterior <br />coatings or coverings. <br />(1) Tested t the installation site using an electric resistance holiday detector. <br />(2) Vac m applied to interstitial space. <br />_ B. Fiberglass <br />(1) Installation instructions require an air test and soap bubble test prior to installation. <br />(2) Vacuum applied to interstitial space. <br />(3)' Hydrostatic annular (primary tank pressure test). <br />_ C. Non -clad steel tank [Section 2635 (a) (2) (A)] <br />(1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />_ (2) Field installed cathodic protection systems designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no less than every 60 days. <br />5 <br />