My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3304
>
2300 - Underground Storage Tank Program
>
PR0516354
>
COMPLIANCE INFO_2002-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 11:44:26 AM
Creation date
6/3/2020 10:00:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2007
RECORD_ID
PR0516354
PE
2361
FACILITY_ID
FA0012437
FACILITY_NAME
CHEVRON 352324
STREET_NUMBER
3304
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
07120013
CURRENT_STATUS
01
SITE_LOCATION
3304 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516354_3304 W HAMMER_2002-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$e,p 05 00 08:14a St&ve Schamaun 916-366-8631 <br />UG TANK BUOYANCYIRESTRAINT CALCULATIONS <br />Proj: Hammer Lane Tesoro, 3304 Hammer Lane, Stockton <br />PN: 24901.00 <br />Ll) 20,000 ON TANK <br />DESIGN, PARAMETERS: <br />G = (A * Q + (N *VS) + VGS) <br />Height of backfill useable for down l (surface to bottom of tank) (h) <br />h'=HC+D <br />h 4.00 + 9.33 =13.33 ft. <br />a=h*SIRS <br />a = 13.33 * 0.30 = 4.00 ft. <br />End area of backfill (A) <br />A=(D+a)*h <br />A (9.33 + 4.00) * 13.33 =178 sq.ft. <br />AS = (D + (2 * a)) * (L + (2 * a)) <br />AS = (9.33 + (2 * 4.00)) * (40.00 + 2 * ( 4.00)) ® 832 sq.ft. <br />VPG = (178 * 40.00) - (2737 +(2 * 38) + 339) = 3958 cu.ft. <br />G = (3958 * (120-62.4) / 1,000 = 228 kips <br />(CDQ * CDH * CDL * CDW) * (RC - 62.4 lb./cu.ft.) / 1,000 lb./kip <br />WDM = (2 * 1.00 * 40.00 *1.00) * (150 - 62.4)) / 1,000 = 7.01 kips <br />HDF : 15 + 30 + 228 + 7 = 280 kips <br />HOLD DOWN FACTOR (HD) - CASE 2 <br />HD=HDF/F <br />H - (280 / 176) -1.59 <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.