My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3304
>
2300 - Underground Storage Tank Program
>
PR0516354
>
COMPLIANCE INFO_2002-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 11:44:26 AM
Creation date
6/3/2020 10:00:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2007
RECORD_ID
PR0516354
PE
2361
FACILITY_ID
FA0012437
FACILITY_NAME
CHEVRON 352324
STREET_NUMBER
3304
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
07120013
CURRENT_STATUS
01
SITE_LOCATION
3304 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516354_3304 W HAMMER_2002-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equip 2nt: `Check this box if tank gauging is used only for inventory control. <br /> U Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the folio ing checklist: <br /> U Yes U No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> U Yes Ll No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> L3 Yes U No* Was accuracy of system product level readings tested? <br /> Q Yes Q No* Was accuracy of system water level readings tested? <br /> L] Yes [❑ =Were all probes reinstalled properly? <br /> .=Yes LU No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): U Check this box if LLDs are not installed. <br /> Complete the folio ing checklist: <br /> F�FVes U No* For equipment start-up or annual equipment 9.omfication, was a leak simulated to verify LLD performance? <br /> Ll N/A (Check all that apply) Simulated leak rate:A1_3 g.p.h.; U 0.1 g.p.h; U 0.2 g.p.h. <br /> ve <br /> s Ll No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> es ❑ No* Was the testing apparatus properly calibrated? <br /> Yes -d-No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> U N/A <br /> U Yes U 0* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> U Yes 13 * For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 0* <br /> trN/A or disconnected? <br /> U Yes L3!,No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> 4 N/A or fails a test? <br /> U-Yes El.-No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> 3 N/A <br /> Yes Ll No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: 4S1/6le, A6 FU 4:c, AIS ID plf:!5Fc, <br /> L-1 C> f4b-r Fu Wc;-r(c, a <br /> Page 3 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.