Laserfiche WebLink
F. In-Tank Gauging/SIR Equip 2nt: `Check this box if tank gauging is used only for inventory control. <br /> U Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the folio ing checklist: <br /> U Yes U No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> U Yes Ll No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> L3 Yes U No* Was accuracy of system product level readings tested? <br /> Q Yes Q No* Was accuracy of system water level readings tested? <br /> L] Yes [❑ =Were all probes reinstalled properly? <br /> .=Yes LU No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): U Check this box if LLDs are not installed. <br /> Complete the folio ing checklist: <br /> F�FVes U No* For equipment start-up or annual equipment 9.omfication, was a leak simulated to verify LLD performance? <br /> Ll N/A (Check all that apply) Simulated leak rate:A1_3 g.p.h.; U 0.1 g.p.h; U 0.2 g.p.h. <br /> ve <br /> s Ll No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> es ❑ No* Was the testing apparatus properly calibrated? <br /> Yes -d-No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> U N/A <br /> U Yes U 0* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> U Yes 13 * For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 0* <br /> trN/A or disconnected? <br /> U Yes L3!,No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> 4 N/A or fails a test? <br /> U-Yes El.-No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> 3 N/A <br /> Yes Ll No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: 4S1/6le, A6 FU 4:c, AIS ID plf:!5Fc, <br /> L-1 C> f4b-r Fu Wc;-r(c, a <br /> Page 3 of 3 03101 <br />