My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3304
>
2300 - Underground Storage Tank Program
>
PR0516354
>
COMPLIANCE INFO_2002-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 11:44:26 AM
Creation date
6/3/2020 10:00:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2007
RECORD_ID
PR0516354
PE
2361
FACILITY_ID
FA0012437
FACILITY_NAME
CHEVRON 352324
STREET_NUMBER
3304
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
07120013
CURRENT_STATUS
01
SITE_LOCATION
3304 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516354_3304 W HAMMER_2002-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DYNAMIC BACK PRESSURE TEST DATA (BLOCKAGE) <br /> Date: <br /> NOZZLE 20 CFH 60 CFH 100 CFH PASS/FAIL NOZZLE 20 CFH 60 CFH 100 CFH PASS/FAIL <br /> (.15" Water) (.45" Water) (.95" Water) (.15" Water) (.45" Water) (.95" Water) <br /> �3 . 23 <br /> 2 <br /> 12-4 S <br /> 2-3 <br /> 103 25 <br /> 5 <br /> 7 <br /> J <br /> ® ® ®®®® ®®® ®®®® ®®® ® ®®®® ®® <br /> **See Long Form Test Report for Wet Failure Testing Blockage Tester Integrity: <br /> LIQUID REMOVAL CHECK , ®1" 1 -?',E 5? S7A.W-f u F' ®• /Sf".w.c.@ 5 minute <br /> D/_ D/ ml ID/ ml D/ ml D/ ml D/ mlD/ mlF D/ mi D/ m1 <br /> D/ ml D/ ml D/ ml D/ ml D/ m1 -D/-- ml <br /> D/ mi D/ ml D/ ml <br /> D/ m1 D/ ml D/ ml D/ ml D/ mi D/ ml / ml D/ ml D/ ml <br /> D/—ml ID/ mi D/ ml D/ ml D/ ml D/ ml D/ ml D/ mi D/ ml <br /> Job Complete Repairs Done to Pass Test: <br /> Not Complete Repairs Still Needed: <br /> Parts: None Drop Tube Orings Fill AdaptorGaskets HosesWh Hose <br /> Nozzles Breakaways PV Valves Others: <br />
The URL can be used to link to this page
Your browser does not support the video tag.