Laserfiche WebLink
P <br />An a I K#1 a <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by CNVI I I <br />14UNMEN"'T <br />AL <br />1. Site map enclosed? YES NO[] <br />2. Submit copies of ICC Service Technician andlor Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that Is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing acomponent, describe how this will be •done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan reView): <br />Disassemble turbine Diesel product line flex connector, clean, re -apply pipe sealant. Re -assemble <br />test for leaks. <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />No parts @ this time <br />3 <br />