Laserfiche WebLink
SWRCB, January 2002 <br />C <br />7. UNDER -DISPENSER CONTAINMENT <br />n <br />TESTING <br />Page of <br />Test Method Developed By: ❑ UDC Manufacturer ❑ Industry Standard X Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: <br />❑ Pressure <br />❑ Other (Spec) <br />❑ Vacuum <br />X Hydrostatic <br />Test Equipment Used: Caldwell Level Change Indicator <br />Equipment Resolution: .002 <br />UDC Manufacturer: <br />UDC # 1&2 <br />Bravo <br />UDC # 3&4 <br />Bravo <br />UDC # 5&6 <br />Bravo <br />UDC # 7&8 <br />Bravo <br />UDC Material: <br />Coated Steel <br />Coated Steel <br />Coated Steel <br />Coated Steel <br />UDC Depth: <br />10" <br />10" <br />10" <br />10" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />Enters from bottom <br />Enters from bottom <br />Enters from bottom <br />Enters from bottom <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Enters from Bottom <br />Enters from Bottom <br />Enters from Bottom <br />Enters from Bottom <br />Condition of UDC prior to <br />testing: <br />Dry <br />Dry <br />Dry <br />Dry <br />Portion of UDC Tested <br />Water Line 8" <br />Water Line 8" <br />Water Line 8" <br />Water Line 8" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />❑ Yes X No ❑ NA <br />❑ Yes X No [INA <br />❑ Yes X No ❑ NA <br />❑ Yes X No ❑ NA <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail- <br />safe shutdown?` <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />o erational?" <br />Yes X No ❑ NA <br />❑ Yes X No ❑ NA <br />❑ Yes X No ❑ NA <br />❑ Yes X No ❑ NA <br />Wait time between applying <br />water and starting test <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />5 Minutes <br />Test Start Time: <br />8:40 <br />8:45 <br />8:50 <br />8:55 <br />Initial Reading (Rj): <br />.001 <br />.001 <br />.001 <br />.001 <br />Test End Time: <br />9:10 <br />9:15 <br />9:20 <br />9:25 <br />Final Reading (RF): <br />.001 <br />.001 <br />.001 <br />.001 <br />Test Duration: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Change in Reading (RF -RI): <br />0 <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />.005/30 Minutes <br />Test Result. <br />X Pass Q Fail <br />X Pass 0 Fail <br />X Pass 0 Fail <br />X Pass 0 Fail <br />Was sensor removed for testing? <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />X Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to aM of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />