My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3304
>
2300 - Underground Storage Tank Program
>
PR0516354
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 2:01:45 PM
Creation date
6/3/2020 10:00:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0516354
PE
2361
FACILITY_ID
FA0012437
FACILITY_NAME
CHEVRON 352324
STREET_NUMBER
3304
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
07120013
CURRENT_STATUS
01
SITE_LOCATION
3304 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516354_3304 W HAMMER_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2006 <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (if applicable), should be provided to the facility ownerloperatorfor submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: Hammer Lane Oil Inc. Date of Testing: 06-25-10 <br />Facility Address: 3304 W. Hammer Lane Stockton CA <br />Facility Contact: Mike Gurm Phone: 209-992-1415 <br />Date Local Agency Was Notified of Testing: 06/15/10 <br />Name of Local Agency Inspector (ifpresent during testing): Garrett Backus <br />Test Method Used: X Hydrostatic 0 Vacuum 0 Other <br />Test Equipment Used: Standard Tape Measure <br />Equipment Resolution: <br />_,77,77 7 7 <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc. <br />T3: Diesel <br />FILL <br />Bucket Installation Type: <br />X Direct Bury <br />0 Contained in SL=p <br />0 Direct Bury <br />0 Contained in SLmp <br />11 Direct Bury <br />0 Contained in Sum p <br />11 Direct Bury <br />0 Contained in Sump <br />Bucket Diameter: <br />12" <br />Bucket Depth: <br />137/811 <br />Wait time between applying <br />vacuum/water and start of test: <br />)min <br />Test Start Time (Ti): <br />1:20p.m. <br />Initial Reading (RI): <br />13" <br />Test End Time (TF): <br />2:20p.m. <br />Final Reading (RF): <br />13" <br />Test Duration (TF — TI): <br />1hr <br />I Change in Reading (RF - Rj): <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />1/16" <br />Test Result. <br />X Pass 0 Fail <br />0 Pass 0 Fail <br />0 Pass 0 Fail <br />0 Pass 0 Fail <br />t.omments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Replaced spill bucket on Diesel (Fill) <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: <br />Date:06-25-10 <br />State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.