My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3304
>
2300 - Underground Storage Tank Program
>
PR0516354
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 2:01:45 PM
Creation date
6/3/2020 10:00:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0516354
PE
2361
FACILITY_ID
FA0012437
FACILITY_NAME
CHEVRON 352324
STREET_NUMBER
3304
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
07120013
CURRENT_STATUS
01
SITE_LOCATION
3304 W HAMMER LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0516354_3304 W HAMMER_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
455
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EMCC! Model A1100 Overfill <br /> WHEATON RETAIL. Prevention Valve OPV <br /> Field Operational Test Procedure TP-A1100 <br /> For Primary Float and Flapper Valve <br /> Service Tools Reauired: <br /> • EMCO Model A0081-1101 test tool •Scribe tool <br /> ONG <br /> CAUTION: <br /> 1. Always barricade work area to keep pedestrians and vehicles from accessing the storage tank area during preventive maintenance <br /> and/or compliance testing of the phase I system. <br /> Securing the Flapper Valve: W., � <br /> NOV 0 � 201 <br /> ENTAL HEALTH <br /> ENVIRON�ARTMENT <br /> nE <br /> Step 1: Remove the spill container lid, Step 2: Remove the Model Al 100 OPV <br /> fill cap and adapter from the tank fill from the tank fill riser. <br /> riser. Note: only remove manhole cover <br /> and water shroud system if necessary. <br /> Y Primary <br /> Float <br /> Step 3: Place the Model All 00 OPV on Figure 1: Correct position, primary float Figure 2: Improper position, primary <br /> its side with the primary float facing facing downward. float facing upward <br /> downward. Refer to Figures 1 and 2 <br /> for details. 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.