Laserfiche WebLink
SWRCB,January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests(if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: HAMMER LANE OIL I Date of Testing: 6/5/2018 <br /> Facility Address: 3304 W.HAMMER LANE STOCKTON,CA 95209 { <br /> Facility Contact: Phone: ' ' .0'` <br /> Date Local Agency Was Notified of Testing:5/23/2018 <br /> Name of Local Agency Inspector(if present during testing): AARON <br /> 2.TESTING CONTRACTOR INFORMATION r ` L <br /> A17N <br /> Company Name: AFFORDA TEST 4162"d Street Galt,CA 95632 (209)744-0fI Fad (2b9)?4d 0116 <br /> Technician Conducting Test: ❑Ed Stearns ® Zane A.Nimmo ❑ David A.Winkler ❑ Felix G.Ramirez <br /> 8883080-UT 8883064-UT 8883059-UT 8883072-UT <br /> Credentials': ®ICC Service Tech. ® SWRCB Tank Tester <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: ®Hydrostatic ❑Vacuum ❑Other <br /> Test Equipment Used: TAPE MEASURE, H2O Equipment Resolution: 1/16" <br /> Identify Spill Bucket(By Tank 1 87 2 3 91 4 DIESEL <br /> Number, Stored Product, etc. <br /> ®Direct Bury ❑Direct Bury ® Direct Bury ®Direct Bury <br /> Bucket Installation Type: EI Contained in El Contained in <br /> El Contained in Sump ❑Contained in Sump <br /> Sump Sum <br /> Bucket Diameter: 11 11 11 <br /> Bucket Depth: 12 12 14 <br /> Wait time between applying <br /> vacuum/water and start of test: <br /> Test Start Time(Tj): 1341 1341 1341 <br /> Initial Reading(Rj): 11 - 11 - 13 - <br /> Test End Time(TF): 1441 1441 1441 <br /> Final Reading(RF): 11 - 11 - 13 - <br /> Test Duration(TF—Ti): HOUR HR HR <br /> Change in Reading(RF-RI): 0 0 0 <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: ® Pass ❑Fail ❑ Pass ❑Fail ® Pass ❑Fail ® Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ALL MEASURED 5 GALLONS <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature: Date: 6/5/2018 <br /> ' State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements <br /> may be more stringent. <br />