My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2829
>
2300 - Underground Storage Tank Program
>
PR0536714
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 7:10:12 PM
Creation date
6/3/2020 10:00:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0536714
PE
2361
FACILITY_ID
FA0011261
FACILITY_NAME
LESCO INC
STREET_NUMBER
2829
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14502013
CURRENT_STATUS
02
SITE_LOCATION
2829 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0536714_2829 W WASHINGTON_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> oA ul San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> �aDonnaIJeran,RHS <br /> { 600 East Main Street <br /> .' Stockton, California 95202-3029 <br /> COORDINATORS" <br /> d�1 <br /> Robert McClellon,REHS 6. Website: www.sigov.org/ehd Jeff Carruesco,REHS,RDI <br /> Phone: (209)468-3420 Kasey Foley.REHS <br /> Fax: (209)464-3433 <br /> APPLICATION FOR UNDERGROUND STORAGE TANK <br /> CLOSURE PERMIT <br /> I. GENERAL INSTRUCTIONS: <br /> 1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned to the <br /> applicant with comments. <br /> 2. Include a detailed site map on a separate sheet of paper, showing the location of the tanks(s), piping, streets, <br /> adjacent properties (north toward the top of the page), nearby septic tanks, leachfields, water wells, buildings, <br /> underground public utility lines (including water, sanitary sewer and storm sewer), and distance of piping from <br /> tank to dispensers. If underground utilities are not included on the site map, you must state in writing that USA <br /> Dig will be contacted prior to excavation activities. <br /> 3. Complete pages 3-5, "Application for Underground Storage Tank Closure Permit of : Sarnplinafirm <br /> shall bg an independent third party from thg contractor, <br /> 4. Complete page 8, "Authorization to Release". This form must be signed and dated by the <br /> Qt OWNER/OPERATOR of the facility. <br /> PQ 5. Submit a"Service Request"form with the appropriate fees, submit completed UPC forms for Facility and Tanks <br /> (formerly State A& B forms)and complete the"Underground Storage Tank Program Fee Worksheet". <br /> [j 6. Complete all questions on page 9, the Environmental Health Department (EHD)"Underground Storage Tank <br /> NSA Disposition Tracking Record", except those requiring a signature and date of tank removal The holder of the <br /> permit shall be responsible for ensuring that this form is completed and returned to EHD within 30 days of the <br /> tank removal. <br /> 7. Submit a "Site Health& Safety Plan"as an addendum to this application, to address all potential hazards for <br /> this specific job site. Refer to the Site Safety Plan Guidance Document for specifics. <br /> N(A[j 8. If facility is located outside of the city limits, submit a 'Backfill Excavation Certificate" as required by the <br /> County of San Joaquin Building Department and the incorporated City Building Departments, pursuant to the <br /> Uniform Building Code STD 70-11. <br /> 9. Obtain a"Grading and Excavation Permit'from the City of Tracy Building Division prior to the Environmental <br /> Health Department(EHD)approval of the closure plan. <br /> N 10. The maximum review time for Closure Plans is 15 working days from receipt of the adequately completed <br /> plan. If gross deficiencies are identified, an addendum will be required with a$125.00/hour fee and the review will <br /> begin on the date of resubmittal, <br /> [� 11. Submit verification of the fire permit from the appropriate fire district at the removal inspection. -to stw),arA <br /> 12. Advance Inspection notice of at least 48 hours is required by EHD. on seoiep.«J <br /> 4 <br /> 13. if planning to over-excavate at time of UST removal, see"I11. SITE MITIGATION"on Page 2. <br /> AN <br /> EH 23 046 (Revised 8/l/I 1) <br />
The URL can be used to link to this page
Your browser does not support the video tag.