Laserfiche WebLink
City of Lathrop <br /> ESCP Worksheet <br /> R-10/19/2017 <br /> What is this document for? <br /> The City's Phase If Small MS4 NPOES General Permit issued by the State Water Board to the <br /> City, requires the City to develop and mainta,n a program to assure that sediment and other <br /> pollutants from construction activities do not flow into the City's storm water drainage system <br /> and,subsequently,impact local receiving waters. The City's Permit requires the City to require <br /> the owner of any construction project having soil disturbance to submit an Erosion and <br /> Sediment Control Plan (ESCP). The ESCP must identify potential sources of erosion and <br /> sedimentation associated with the project and identify the control measures (best <br /> management practices or BMPs)used to prevent eros-on and control sedimentation within the <br /> project. This document is a worksheet to assist owners of small projects to determine <br /> appropriate control measures for their project <br /> Who is required to complete this document? <br /> All construction projects that have soil disturbance and pass through plan check or the City's <br /> permitting process must develop an ESCP. Projects having more than 1 acre of soil disturbance <br /> or those projects that are part of a larger common plan may be required to comply with the <br /> State Water Board's Construction General Permit(CGP), which requ;res the development of a <br /> Storm Water Pollution Prevention Plan (SWPPP). For these larger projects, the CGP-required <br /> SWPPP may be submitted in lieu of the ESCP. For all other projects(small projects)having less <br /> than 1 acre of soil disturbance or those that qualify for a waiver or exemption from the CGP, <br /> they must submit an ESCP using this worksheet <br /> What is required in this document? <br /> BMPs,ns defirt-d an thL EPA'swebsite,is <br /> This worksheet requires basic project and contact Il .o ter,n used to drscribe t;We of wrter <br /> information, as well as, basic site information including <br /> location, status, approximate start and end dates and the <br /> area of soil disturbance. cOritrois Used to nuinage be quaritity and <br /> ranoff <br /> The Best Management Practices (BMPs) that will be used <br /> during construction are also required to be identified. <br /> MovesIt <br /> A basic site map showing the project boundaries, adjacent more details on Bws please visit thv <br /> streets, storm drain inlets, placement of BMPs, and where California Storm Watt!r Qoality <br /> construction work will be occurring is required to be Association's wej)sitE!,1t <br /> included. <br /> or Caltrans's website at: <br /> 3 <br />