Laserfiche WebLink
Geosyntec° <br /> 4. PILOT TEST IMPLEMENTATION <br /> 4.1 Pre-Field Activities <br /> Prior to commencing field implementation activities, the following will be performed: <br /> • The Site-specific Health and Safety Plan (HASP) will be updated to support <br /> implementation of the pilot test. The HASP will be kept on-Site during field <br /> implementation and reviewed by project staff during daily tailgate health and safety <br /> meetings; <br /> • Drilling permits will be obtained from the San Joaquin County Environmental Health <br /> Department (SJCEHD) for all wells located at the three pilot test locations; <br /> • Access will be established with Simplot and other off-Site property owners including Super <br /> Store Industries, Inc. under existing agreements, as necessary. All property owners will be <br /> properly notified of the proposed scope of work, work hours and schedule in advance of <br /> field implementation; <br /> • The boring locations will be marked with white paint or stakes and underground service <br /> alert (USA) will be contacted a minimum of 48 hours prior to commencement of drilling <br /> activities; and <br /> • A private utility locator will perform physical surveys to clear potential subsurface utilities <br /> or other obstructions at the proposed boring locations prior to drilling work. <br /> Because sulfolane degradation was not observed in water samples from the PSW, additional <br /> amendments including nutrients or bioaugmentation using a microbial culture capable of <br /> degrading sulfolane may be required to enhance ISB near Pilot Test Area B and C. This may <br /> require procurement of the CVRWQCB's WDR General Waiver permit or a modification to the <br /> Site-specific WDR prior to implementation. If a permit is required, pilot testing(air injection only) <br /> may be initiated at PTA A, while permit procurement activities are undertaken for the additional <br /> amendments. <br /> 4.2 Pilot Testing Activities <br /> 4.2.1 Well Installation and Development <br /> 4.2.2.1 Mobilization and Site Preparation <br /> Prior to commencement of drilling activities, the drill-rig and associated equipment and an air- <br /> knife crew will mobilize to the Site. The proposed drilling locations will be air-knifed to a <br /> minimum of 5 feet bgs or deeper depending on property owner preference to clear utilities prior to <br /> commencement of drilling activities. Appropriately sized containers for storing waste generated <br /> during drilling activities will also be mobilized and placed in an accessible location at the Site. <br /> In-Situ Bioremediation Pilot Test Work Plan—GSH Lathrop 8 <br />