My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MCKINLEY
>
16051
>
2900 - Site Mitigation Program
>
PR0544578
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 2:01:46 PM
Creation date
6/3/2020 11:03:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0544578
PE
2960
FACILITY_ID
FA0025339
FACILITY_NAME
CITY OF LATHROP RIGHT OF WAY
STREET_NUMBER
16051
STREET_NAME
MCKINLEY
STREET_TYPE
AVE
City
LATHROP
Zip
95330
CURRENT_STATUS
02
SITE_LOCATION
16051 MCKINLEY AVE
P_LOCATION
07
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Lathrop <br /> ESCP Worksheet <br /> Rev.10/19.,2017 <br /> 4.3 Temporary Sediment Control BMPs <br /> accomplishedSediment control is by two ways. First,giving sedimentopportunity to settle out of <br /> storm water runoff while still on the project. Second,remove sediment from surfaces that has been <br /> carried ortracked off site before it entersthe municipal drains. Eiichprojec-.tmtjst'r.:Iv(!(,ff(,ctiv(! <br /> perimeter sediment control. Drain projectprotected. <br /> track Out orsedimentation onto ITILinicipal property must be removed as soon as possible. On the tab'e <br /> below • on •w how you will controlyour <br /> CASCA BMP Describe the BMP to be implemented. <br /> Fact BMP Name Selected? <br /> Sheet (Check Box) If not used,state the reason why. <br /> SE-1 Temporary Silt Fence The drilling is cased,to contain any potential <br /> runoff. Straw waddles will be in place in case <br /> any unanticipated water Is encountered <br /> SE-2 or Sediment basin or trap(all or some of the storm water drains to a X Water will be contained with a trough for <br /> SE-3 retention pond or basin where sediment can settle out) drilling <br /> SE-5 Temporary Fiber Rolls/Straw Wattles Any potential run off will be contained by the <br /> drill rig <br /> SE-6 or Temporary Gravel Bag Berm or Sand Bag Barrier Any disturbed soil will be contained by the <br /> SE-8 drill rig and/or straw bales. <br /> SE-7 Street Sweeping(inspect roads and sidewalks daily and sweep as X Street sweeping will be completed as necessary <br /> necessary) <br /> Lodi Curb cutback(maintain a minimum of 4 inches of elevation The disturbed soil is at a lower elevation than <br /> Standard difference between the disturbed soil and the top of the existing X the road,so any disturbed soil will be <br /> curb,sidewalk,or paved surface) contained off the roadway <br /> SE-10 Temporary Drain Inlet Protection(mandatory for any DI's within There are no DI's within 50 ft of the project <br /> SO feet of the project) <br /> 5E-13 Compost Socks/Biofilter Bags The soil disturbance will be contained within a <br /> trough directly above the borehole <br /> Lodi Stabilized Construction Exit—Constructed with aggregate at the The area is already covered in gravel,so no <br /> Standard project owner's specification,but it must be effective in trackout is expected <br /> controlling trackout. <br /> TC-2 Stabilized Construction Roadways The work is planned to stay to the side of the <br /> X roadway,and not involve work in the <br /> roadway. <br /> WM-03 Stockpile Management(stockpiles that have not been actively <br /> used in the last 14 days must be covered with an erosion control X Any soil produced from the borehole will be <br /> blanket or plastic sheeting and contained with a fiber roll or gravel containerized in a covered roll off box on site <br /> bag berm) <br /> - 9 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.