My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
8751
>
3500 - Local Oversight Program
>
PR0545718
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:22 PM
Creation date
6/3/2020 11:19:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545718
PE
3528
FACILITY_ID
FA0005526
FACILITY_NAME
K2 LOGISTICS
STREET_NUMBER
8751
Direction
E
STREET_NAME
STATE ROUTE 12
City
VICTOR
Zip
95253
APN
05139001
CURRENT_STATUS
02
SITE_LOCATION
8751 E HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.1.2 Collecting Drill Cuttings <br /> The field geologist/engineer may observe drill cuttings from the drilling fluid return for <br /> litholagic information to supplement discrete sampling.'Sampling and logging cuttings will be ' <br /> performed as follows: <br /> 3 <br /> 1. The height of the drilling table above ground surface, lengths of the drill bit, sub and <br /> drill collars, and length of drill rods should be taken into account in calculating the <br /> depth of penetration. <br /> 2. In mud rotary drilling, a small-diameter, fine mesh hand screen will be used to obtain <br /> a sample of the cuttings from the borings byjholding the screen directly in the flow <br /> of the drill fluid return line. In air rotary drilling, cuttings will be collected after <br /> L discharge from the cyclone. <br /> 3. In rotary drilling, a composite sample may be obtained from the return line by <br /> leaving the screen in place during the time intakes the driller to advance the boring to <br /> a preselected depth. <br /> 4. In rotary drilling, the travel time for cuttings to reach the surface may be estimated <br /> each time the driller adds a new length of drill rod by timing the first arrival of <br /> cuttings after circulation is resumed. This travel time can be used along with the <br /> depth of penetration to estimate the start and finish of each 5-foot sampling interval. <br /> 3.2 LOGGING OF EXPLORATORY BORINGS <br /> The observations of the field geologist/engineer will be recorded on a BORING LOG OR WELL <br /> LOG at the time of drilling. The drill rig operator and the field geologist/engineer will discuss <br /> significant changes in material penetrated, drilling conditions, hydraulic pressure, drilling action, <br /> and drilling fluid circulation rate. The field geologist/engineer will be present during drilling of <br /> soil borings and will observe and record such changes by time and depth. <br /> Drill cuttings and core samples will be observed in the field. A lithologic description will be <br /> recorded on the BORING LOG using the Unified Soil Classification System (OSCS) as <br /> described in the American Society of Testing and Materials (ASTM) Standard D 2488-90. This <br /> description will include the USCS soil type, grain sizes and estimated percentages of each, <br /> moisture content, color according to the Munsell color charts (Kollmorgen'Instruments Corp.), <br /> plasticity for fine-grained materials, consistency, and other.pertinent information, such as degree <br /> DRILLING AND DESTRUCTION OF SOIL BORINGS Page 4 of 6 <br /> PHOTO-DD.doo REVISION DATE:MARCH 096 DD-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.