My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
8751
>
3500 - Local Oversight Program
>
PR0545718
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:22 PM
Creation date
6/3/2020 11:19:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545718
PE
3528
FACILITY_ID
FA0005526
FACILITY_NAME
K2 LOGISTICS
STREET_NUMBER
8751
Direction
E
STREET_NAME
STATE ROUTE 12
City
VICTOR
Zip
95253
APN
05139001
CURRENT_STATUS
02
SITE_LOCATION
8751 E HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lo which provides a temporary, closed-system, hydraulic connection. Groundwater samples are <br /> obtained directly from the Enviro Probe into the pre-evacuated sample vials. The pressure <br /> transducer is used to monitor filling of the sample vial and to measure hydrostatic pressure of <br /> the formation after the sample vial has filled. If needed, the pore pressure unit or the GMS <br /> groundwater sampling unit can be used independently. The time allowed to fill the vial <br /> depends on the physical properties of the target formation and.the groundwater pressure at the <br /> depth of the probe. <br /> Lr <br /> After the sample vial has filled, the sample housing is withdrawn from the drive rods and the <br /> LM sample vial removed. The Enviro Probe is generally purged by removing one probe volume <br /> (approximately 15.ml) of groundwater prior to collecting a sample for preservation and <br /> transport to the laboratory. The probe can be sampled repeatedly at the same depth by <br /> repeating the sample collection procedures. <br /> 3.2 HYDROPUNCH° SAMPLING PROCEDURES <br /> �- HydroPunch° I groundwater samples are usually collected under hydrostatic conditions, <br /> whereby groundwater flows from the formation through the screen section and into the sample. <br /> reservoir. Accordingly, HydroPunchm I cannot be used at depths less than approximately 5 <br /> feet below the water table. The sample reservoir is allowed to fill until groundwater enters the <br /> L. drive rod. The water level inside the drive rod can be detected using a well sounder. The <br /> ' actual sample collection time at each depth depends upon the physical properties of the target <br /> La zone and the fluid pressure outside the probe. Once the sample reservoir is filled, the <br /> HydroPuncb' is returned to the surface. Although the sample reservoir is sealed at both ends <br /> by internal one-way check valves, care must be taken to avoid sample cross-communication <br /> with transmissive units or borehole fluids at a higher potentiometric head than the target zone. <br /> Before retrieving the tool, deionized water should be added to the drive rod to a level that <br /> exceeds the highest potentiometric surface in the borehole. <br /> �. HydroPunch° H can be used below the water table, in a manner similar to HydroPuncb® 1, or <br /> it can be used at the water table in the "hydrocarbon mode." If HydroPuncY 11 is used in the <br /> Lr <br /> DISCRETE-DEPTH SAMPLING Page 4 of 6 <br /> MSCIPROTO-DS.= REVISION DATE:MARCH 1996 DS-4 <br /> I.r <br />
The URL can be used to link to this page
Your browser does not support the video tag.