My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
8751
>
3500 - Local Oversight Program
>
PR0545718
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:48:22 PM
Creation date
6/3/2020 11:19:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545718
PE
3528
FACILITY_ID
FA0005526
FACILITY_NAME
K2 LOGISTICS
STREET_NUMBER
8751
Direction
E
STREET_NAME
STATE ROUTE 12
City
VICTOR
Zip
95253
APN
05139001
CURRENT_STATUS
02
SITE_LOCATION
8751 E HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROTOCOL <br /> DRILLING AND DESTRUCTION OF SOIL BORINGS <br /> 1.0 INTRODUCTION <br /> This protocol describes the procedures to be followed during drilling and destruction of soil <br /> borings. The soil borings will provide information about geologic conditions, soil engineering <br /> properties, and/or soil quality. If the soil boring is utilized for well installation, the well will be <br /> installed in accordance with the protocol INSTALLATION OF WELLS. ! <br /> The procedures presented herein are intended to be of general use and may be supplemented by a <br /> work plan and/or health and safety plan. As the work progresses and if warranted, appropriate <br /> revisions may be made by the project manager. Detailed'procedures in this <br /> protocol maybe <br /> superseded by applicable regulatory requirements. <br /> If required,permits for drilling of soil borings will be acquired from the appropriate agency(s) <br /> . 1 <br /> before drilling is initiated, and an underground utility check will be conducted before drilling <br /> begins. An underground utility check will, at a minimum, consist of contacting a local utility <br /> alert service, if available. <br /> 2.0 DRILLING <br /> A DAILY FIELD RECORD will be completed for each day of fieldwork, and the original will <br /> be kept in the project files. <br /> The soil borings will be drilled using rotary,hollow stem-auger, direct-push, or other appropriate <br /> method. In all rotary borings, compressed air will be f ltered to remove oils before being <br /> ` circulated into the borehole. In mud rotary borings, appropriate drilling fluid additives, such as <br /> bentonite, will be used to maintain an open hole and to carry cuttings to the surface. However, <br /> organic drilling fluid additives will only be used with prior project manager approval. The <br /> DRILLING AND DESTRUCTION OF SOIL BORINGS Page 1 of 6 <br /> PROTO-DD.doc REVISION DATE:MARCH 1996 DD-1 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.