My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008831
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
13889
>
3500 - Local Oversight Program
>
PR0545719
>
ARCHIVED REPORTS_XR0008831
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:45:50 PM
Creation date
6/3/2020 11:27:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008831
RECORD_ID
PR0545719
PE
3528
FACILITY_ID
FA0005335
FACILITY_NAME
CHARLES JACOBS
STREET_NUMBER
13889
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
13889 W HWY 12
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Advanced <br /> • GeoEnvironmental, Inc. = _ <br /> 13 September 2004 <br /> AGE-NC Project No 00-0696 S E P 2 7 2004 <br /> ENVIRONNIE,J, H,'LA FH <br /> Mr Mike Infurna PER,%IIT/SEnVICES <br /> San Joaquin County Environmental Health Department <br /> 304 East Weber Avenue, 3`d Floor <br /> Stockton, CA 95202 <br /> Subject: Monitoring Well Installation Work Plan Addendum <br /> TERMINOUS MARKET <br /> 13889 West Highway 12, Lodi, California <br /> Dear Mr Infuma <br /> On behalfofMr Charles Jacobs,Advanced GeoEnvironmental,Inc (AGE)would like to implement <br /> • the work plan, dated 05 July 2000, for the installation of ground water monitoring wells at 13889 <br /> West Highway 12, Lodi, California The above-referenced work plan was approved by the San <br /> Joaquin County Environmental Health Department (SJCEHD) in a letter dated 06 July 2000 <br /> The scope of work includes <br /> • Advancement of four pilot soil borings to 15 feet below surface grade (bsg), <br /> • Collection and analysis of soil samples, <br /> • Monitoring well installation, development, and surveying, <br /> • Performance of a Quarterly Monitoring event, and <br /> • Preparation of a report of findings <br /> The following analyses for soil and ground water samples are included in the work plan <br /> • Total petroleum hydrocarbons quantified as gasoline (TPH-g) in accordance with EPA <br /> Method 8015 Modified/5030, <br /> • Benzene, toluene, ethylbenzene, and total xylenes(BTEX)compounds and methyl tertiary- <br /> butyl ether(MTBE)in accordance with EPA Method 8020 for soil samples and EPA Method <br /> 602 for ground water samples, and <br /> • Fuel oxygenated compounds including MTBE, tertiary-butyl alcohol (TBA), di-isopropyl <br /> 837 Shaw Road,Stockton, California 95215 <br /> Telephone(209)467-1006 FAX(209)467-1118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.