My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
18974
>
3500 - Local Oversight Program
>
PR0545721
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 11:38:08 AM
Creation date
6/3/2020 11:34:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545721
PE
3528
FACILITY_ID
FA0005425
FACILITY_NAME
LINDEN SHORT STOP
STREET_NUMBER
18974
STREET_NAME
MAIN
STREET_TYPE
ST
City
LINDEN
Zip
95236
CURRENT_STATUS
02
SITE_LOCATION
18974 MAIN ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Manuel Santos August 20, 1990 <br /> Edward Santos, et. al. page 2 <br /> o Finally, WESTON will collect a single well water sample from <br /> the on-site irrigation well. This sample will be collected <br /> only after allowing the .well to purge for a minimum of ten <br /> minutes and will be collected from the closest accessible tap. <br /> This water. sample will be-analyzed for TPH-G; BTX&E, Total <br /> Lead and Ethylene Dibromide (EDB) . <br /> Schedule <br /> Upon receipt of authorization to proceed, WESTON .will forward a <br /> copy of this proposal to the EHD for their approval prior to <br /> collecting the samples. <br /> Once EHD approval has been received and the re-excavation -of Pit B <br /> has been completed, WESTON will require six days to mobilize and <br /> one day to collect the samples. <br /> The sample analysis will require three weeks and a minimum of eight <br /> days will be required for the report preparation. <br /> Reporting <br /> Upon receipt of the sample analytical results, WESTON will prepare <br /> a site investigation report whichwill - coritain a complete discus- <br /> sion of all field sampling activities and analytical results. <br /> Additionally, the report will compare the analytical results with <br /> published regulatory standards. .and provide recommendations as to <br /> follow-up site activities as required. MIA <br /> Should you have any questions, please do not hesitate to call me or ; <br /> Mr. Paul Sundberg at WESTON's Stockton office. <br /> Ile <br /> Sincerely, <br /> ROY F.. WESTON, INC. <br /> Robert M. Sengebush, R.G. <br /> Project Manager <br /> RMS/cmc <br />
The URL can be used to link to this page
Your browser does not support the video tag.