Laserfiche WebLink
• Monitoring Schedule <br /> The quarterly monitoring for this site is scheduled to continue at quarterly intervals <br /> Limitations <br /> This report has been prepared specifically for the M & M site, and was done according to the <br /> State and local agency suggested guidance documents for these investigations The <br /> interpretations, conclusions and recommendations made herein are based on the data and <br /> analysts for the water samples collected on-site and should be reviewed in the context of the <br /> whole report Please note that reports of contamination must be submitted to the agencies in a <br /> timely manner Wright Environmental Services, Inc is not responsible for errors in <br /> laboratory analysis and reporting, or for information withheld during the course of the study <br /> No warranty or guarantee is expressed or implied therein <br /> If you have any questions concerning this report, please call <br /> Sincerely, <br /> Wright Environmental Services, Inc RF-D GFS <br /> N2 1262 7° � <br /> 5hn Affonso Chnstopher M PalmerCER1�FlED <br /> ect Manager CEG 1262; HG 246 ENGINEERING <br /> `P GEOLOGIST <br /> P <br /> OF CAVV�P�\ <br /> Attachments: <br /> Figure 1 Site Plan and Groundwater Elevation Contour Map <br /> Appendix A Groundwater Sampling Information Sheets <br /> Appendix B Chemical Analytical Date and Cham-of-Custody Form <br /> cc: San Joaquin County PHS-EHD, ATT N Steve Sasson <br /> Regional Water Quality Control Board, ATTN Ms Elizabeth Thayer <br /> • M & M Automotive Project No 4100-QM Page 3 <br />