Laserfiche WebLink
Page 1 of 2 rNCROACHMENT PERMi 1 vz!udxx Na. <br /> CITY OF TRACY DATE OF ISSUANCE_ <br /> PBRHIT VALID UP T'C <br /> PROaECT COST <br /> <OSPECTION DEPOSI � 02. $ <br /> ERHIT FEE <br /> ENGINEERING FEES. -- <br /> TESTING FEES- <br /> -IF f L. t=; �>PERFORMANCE HgAD_ 45- <br /> ----------- <br /> THIS <br /> THIS PERMIT IS HEREBY ISSUED TO ENCROhCH OH THE ��1� �� • •moi!' � �""��•� ��"� ' ^� 1�" <br /> + .PHS t 0 �i �- A 4 L,-roto A-L�1r&Z Taft THE PURPOS OF <br /> i!r -ss�4. -A'S; <br /> APPROVED BY FIELD SUPERINTENDENT: <br /> CONTACT PHONE PHONE NUMBER: . ,�"t—�'�►e4�, _ <br /> CONDITIONS OF PURMIT <br /> 'a3! '46o <br /> 1. The PermitLee siiall notify the public Forks Department - Inspection Diviuion (e9-k-+400 forty--eight (46) houra <br /> rior to utart of work pertaining hereto. <br /> 2. The Permittee agrees to parform work under thin permit in accordance with the prevailing City St.andardn, <br /> Specificatione and shall Comply with all existing codes and policies. <br /> Petmittee shall notify police R fire Departments before starting construction of any Wolk. <br /> 4. TenLati,ve starting date t A 4 0 7� ', lot <br /> 5. Tentative completion date 0 • W% 96 CITY rNSPDCTOR'S COMPLETION REPORT <br /> If construction xe not started within 90 days from <br /> the iaaus date, thia permit will be void unless DATE OF COMPLETICN <br /> otherw1au stated in the special conditions. CONCRETE_ -- <br /> 7. Contractors must display name and phone number at work ASPILUT�_ - -- _ <br /> utte -- preferably on barricadea. SIDEKALK <br /> 8. The cost of emergency work required to restored BACKFILL <br /> ungatiefactory construction that becomes a hazard will PAVING_ <br /> be charged to the Perms,ttee. SIZE OF CUT <br /> i 9. Replace full concrete nidewalk squares, ars required, SQ. FT. INCHES <br /> t:y uawcurting along ucore marks. PAVED BY: <br /> la. Compaction testo shall be required on backfilled trenched <br /> at the expense of the Permittee (Contact City Engineering COMMENTS:_ -- <br /> Department) . <br /> 11, Traffic control shall be in accordance with the S_t#rrE <br /> Traffic Manual. <br /> 12. Trenching end reaurtacing is to comply with Standard <br /> r) -in Nn_ C;n1 and �;01A <br />