My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_PART 3 FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HOWLAND
>
16777
>
2900 - Site Mitigation Program
>
PR0009015
>
FIELD DOCUMENTS_PART 3 FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2020 2:20:14 PM
Creation date
6/3/2020 2:11:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
PART 3 FILE 2
RECORD_ID
PR0009015
PE
2960
FACILITY_ID
FA0004094
FACILITY_NAME
J R SIMPLOT (OCCIDENTAL CHEMICAL)
STREET_NUMBER
16777
STREET_NAME
HOWLAND
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19818005
CURRENT_STATUS
02
SITE_LOCATION
16777 HOWLAND RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEIL O.ANDERSON ELL / BOREHOLE LOG BORING ID:LP-5 WELL ID: LP-5 <br /> A 4 D A 5 5 0 C I A f E 5 <br /> 902 industrial Way,Lodi,CA 95240 PROJECT NAME: J. R.Simplot Company PROJECT NUMBER: E06109A <br /> (209)367-3701 Fax(209)333-8303 <br /> DRILLING EQUIP.: B-53 DATE DRILLED: 12/14/2006 NORTHINGS: N/A <br /> DRILLER: Angel Chavez BORE DIAMETER: 10 INCHES EASTINGS: N/A <br /> TECHNICIAN: James Robinson WELL DIAMETER: N/A ELEVATION: N/A Feet <br /> LOCATION:Lathrop,CA TOTAL DEPTH: 25 FEET PLATE NO.: B1 PAGE: 1 of 1 <br /> o wL. <br /> :3E m o <br /> o o m o <br /> x m U U rn t <br /> r n3 3 c J C/)n E n O p o U <br /> o � m 00 = c� c Soil Lithology Description Well Construction Detail <br /> 0-- <br /> Monitoring Well LP-5 was drilled out on <br /> December 14,2006. Neil O Anderson and <br /> Associates used a 10 inch auger to drill out the <br /> monitoring well. The borehole was tilled with <br /> grout as part of the abondonment of LP-5. <br /> -10 <br /> Cement Grount <br /> -20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.