My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
817
>
2200 - Hazardous Waste Program
>
PR0541153
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2021 10:28:46 AM
Creation date
6/3/2020 2:18:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0541153
PE
2220
FACILITY_ID
FA0004727
FACILITY_NAME
CALIF WELDING SUPPLY CO
STREET_NUMBER
817
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14714052
CURRENT_STATUS
01
SITE_LOCATION
817 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Licensed for the sole use of the purchaser,See license agreement penalties for distribution. <br /> CGA G-1.8-2017 COMPRESSED GAS ASSOCIATION INC. PAGE III <br /> Contents Page <br /> 1 Introduction...................................................................................... 1 <br /> ..................................................... <br /> 2 Scope and purpose...................................................................................................... 1 <br /> 3 Definitions....................................................................................................... 1 <br /> .......................... <br /> 4 Carbide lime technical issues.................................................................... 2 <br /> .......................................... <br /> 4.1 Chemical/physical properties of carbide lime....................... ........... <br /> .. 2.............................................. <br /> 4.2 Lime uses........................................................................................ ........................... 3 <br /> 5 Regulatory issues for carbide lime........................:............................................................... <br /> 5.1 Carbide lime—a.co-product.................................................................. <br /> 5.2 Carbide lime ponds.................................................................. .4 <br /> ...................................................... <br /> 5.3 Canadian regulations ....................................................... <br /> 6 Potential environmental issues......................................... 4 <br /> ...........:............................................................... <br /> 6.1 Soil.......................................................................................................................................................4 <br /> 6.2 Groundwater.............................................................................. 4 <br /> 6.3 Surface water.................................................................................................. 4 <br /> 6.4 Air.............................................................................................. <br /> 7 Lime pond operation and maintenance............................................................ 5 <br /> .................... . <br /> 7.1 Security and posting............................................................... .....................5 <br /> 7.2 Safe handling.......................................................................................................................................5 <br /> 7.3 Lime pond integrity.............................................................. .5 <br /> 7,4 Removal of lime slurry or lime paste................................................ 6 <br /> 8 Lime pond closure procedures.................................................. 7 <br /> 8.1 Phase I—Site characterization and regulatory review............................................. ... ...............7 <br /> 8.2 Phase II—Development of a site-specific closure work plan................... ..........g <br /> ................................. <br /> 8.3 Phase III—Work plan implementation.......................................................... ................. ....10 <br /> .............. <br /> 8.4 Phase IV---Postclosure ...................................................... 11 <br /> 9 References............................................................................................. <br /> Appendices <br /> Appendix A--Phase I checklist—facility and lime impoundment characteristics (Informative)...........................12 <br /> Appendix B—Phase I checklist—regulatory requirements(Informative)..................... ...............14 <br /> This document fcensed for the sole use of the purchaser. it may not be shared with any other person or used after the expiration date <br /> without the express written permission of the CGA.Any unauthorized use, reproduction, distribution, or modification of this printed page will <br /> result in a$5,000 liquidated damages fee plus loss of access to CGA publications for one year for your company. <br />
The URL can be used to link to this page
Your browser does not support the video tag.