Laserfiche WebLink
i <br /> and has an additional 11 to 12 feet of water column to pull water from <br /> i <br /> than MW-1 resulting in possible dilution. <br /> The clustered wells proposed in the April 1989 work plan are a -good <br /> idea. They will hopefully explain the discrepancies in data between <br /> RW-1 and MW-1 by examining the vertical distribution of hydrocarbons in <br /> ground water beneath the <br /> site. <br /> 6. The April 1989 work plan proposes the" installation of two monitoring <br /> wells north of the site. I think they are fine, but additional wells <br /> the zero line" for which a recover well <br /> will be necessary to define Y <br /> system will need to be designed to completely capture. <br /> If you have any questions, please call me at .(916) 361-5725. <br /> EDWARD W. JAMES <br /> Engineering Geologist <br /> EWJ:ewj" <br /> " I <br /> i <br /> 6 <br />